A business needs a new Service Order process that includes meter commands.
Which THREE options should you configure to build this process?

  1. Measuring component type
  2. Device configuration type
  3. Activity type
  4. Communication type Message sender

Answer(s): A,C,D

Explanation:

To build a new Service Order process that includes meter commands, you need to configure the following options:
Measuring component type: This defines the type of measurement that a device can record, such as scalar, interval, or event. You can associate meter commands with measuring component types to perform actions on devices that have those types.
Activity type: This defines the type of work that needs to be performed on a service point or device, such as installation, removal, or inspection. You can associate meter commands with activity types to trigger actions on devices when an activity is completed. Communication type Message sender: This defines the communication channel and protocol that is used to send meter commands to devices. You can configure message senders for different communication types, such as AMI, AMR, or manual.
You do not need to configure device configuration type, which defines the physical characteristics and attributes of a device, such as manufacturer, model, or serial number. Device configuration type does not affect meter commands.


Reference:

1: Oracle Utilities Meter Solution Cloud Service - Business User Guide - Chapter 4:
Configuring Meter Solution Cloud Service



In the SaaS solution, how should you configure equipment that attaches to an asset, such as a communication module attached to a meter?

  1. Set up a component
  2. Create a master child asset
  3. Add a sub-asset
  4. Add a constituent part

Answer(s): A

Explanation:

To configure equipment that attaches to an asset, such as a communication module attached to a meter, you should set up a component. A component is a part of an asset that can be installed and removed independently of the asset. You can define component types and associate them with asset types. For example, you can define a communication module component type and associate it with a meter asset type.
You do not need to create a master child asset, which is a relationship between two assets that are installed at different service points but are functionally related. For example, you can define a transformer as a master asset and a meter as a child asset. A master child asset is not suitable for equipment that attaches to an asset.
You do not need to add a sub-asset, which is an asset that is installed at the same service point as another asset but has its own measuring components and usage subscriptions. For example, you can define a meter as a sub-asset of another meter if they share the same service point but have different measurements. A sub-asset is not suitable for equipment that attaches to an asset. You do not need to add a constituent part, which is an attribute of an asset that cannot be installed or removed independently of the asset. For example, you can define a battery as a constituent part of a meter if it is embedded in the meter and cannot be replaced. A constituent part is not suitable for equipment that attaches to an asset.


Reference:

2: Oracle Utilities Meter Solution Cloud Service - Business User Guide - Chapter 5:
Managing Assets



3. For a Meter Data Management (MDM) implementation, customer information system (CIS) requires the following bill determinants:
· For scalar meters, scalar consumption values will be sent to CIS. · For interval meters, billed on time-of-use (TOU) rates, consumption values will be provided based on the specific TOU periods, for example: on-peak, off-peak, and shoulder. Based on these requirements, which TWO usage subscription or usage calculation group configuration options should you set up to allow an implementation to send bill determinants to CIS?

  1. Scalar specific group as a fallback Validation, Estimation, and Editing (VEE) group.
  2. TOU usage group as a fallback VEE group.
  3. Scalar usage calculation rule with a valid usage group.
  4. TOU usage rule with a valid usage group.

Answer(s): C

Explanation:

To allow an implementation to send bill determinants to CIS based on the requirements, you should set up the following usage subscription or usage calculation group configuration options:
Scalar usage calculation rule with a valid usage group: This defines how scalar consumption values are calculated from measurements and sent to CIS. You can define scalar usage calculation rules for different measurement types and associate them with usage groups. A usage group is a collection of usage calculation rules that are applied to measurements based on certain criteria. TOU usage rule with a valid usage group: This defines how TOU consumption values are calculated from measurements and sent to CIS based on specific TOU periods. You can define TOU usage rules for different measurement types and associate them with usage groups. A usage group is a collection of usage calculation rules that are applied to measurements based on certain criteria. You do not need to set up scalar specific group as a fallback VEE group or TOU usage group as a fallback VEE group. A fallback VEE group is used when there is no matching VEE group for a measurement based on its characteristics. A VEE group is a collection of VEE rules that are applied to measurements to validate, estimate, and edit them



A customer is starting an Advanced Meter Infrastructure (AMI) roll-out initiative and plans to use Meter Data Management (MDM). The AMI meters will record the consumption reading every 15 minutes through the day and a single register read at the end of the day. They plan to use this data for billing, load research, and presentment via their customer web portal.
What is the minimum number of measuring component types the customer needs to create in MDM?

  1. A single measuring component type to store AMI data (15-minute interval reading along with the daily scalar register reading) for each case purpose, far example: billing, load research, and customer web portal.
  2. A single measuring component type to store the 15-minute interval readings and another measuring component type for the daily scalar register reading.
  3. A single measuring component type to store the 15-minute interval readings, and another measuring component type for the daily scalar register reading for each use case purpose, for example: billing, load research, and customer web portal.
  4. A single measuring component type to store the 15-minute interval readings along with the daily scalar register reading.

Answer(s): D

Explanation:

The customer needs to create a single measuring component type to store the 15-minute interval readings along with the daily scalar register reading. A measuring component type defines the type of measurement that a device can record, such as scalar, interval, or event. A measuring component type can store multiple measurement types, such as interval and scalar, for different purposes, such as billing, load research, and presentment.
The customer does not need to create separate measuring component types for each measurement type or each use case purpose. This would result in unnecessary duplication of data and complexity of configuration.


Reference:

1: Oracle Utilities Meter Data Management - Business User Guide - Chapter 3: Configuring Meter Data Management






Post your Comments and Discuss Oracle 1Z0-1091-22 exam prep with other Community members:

1Z0-1091-22 Exam Discussions & Posts