Free Oracle 1Z0-996-22 Exam Braindumps (page: 2)

Critical validation rules verify the integrity of the initial measurement data (IMD). If an implementation needs to add new critical validations, where would you configure them?

  1. as new lifecycle algorithms on the IMD Seeder BO (D1-IMDSeeder)
  2. in the pre-processing algorithm of the IMD Seeder BO (Dl-IMDSeeder)
  3. as options on the IMD Seeder BO (D1-IMDSeeder)
  4. in the schema of the IMD Seeder BO (D1-IMDSeeder)
  5. in the validation algorithm on the IMD Seeder BO (D1-IMDSeeder)

Answer(s): B



Which three statements are true about usage subscriptions? (Choose three.)

  1. A usage subscription can have either parent or child service points.
  2. A usage subscription can be configured to include only a portion of a service point usage.
  3. A usage subscription can have many service points.
  4. Usage subscriptions are always related to an account.
  5. A usage subscription can have only one service point.

Answer(s): A,C,D


Reference:

https://docs.oracle.com/cd/E38983_04/PDF/MDM_Configuration_Guide_v2_1_0_3.pdf (227)



On which three entities can proration be disabled? (Choose three.)

  1. Calculation Rule Business Object
  2. Bill Factor
  3. Calculation Rule
  4. Rate Version Calculation Group
  5. Rate Schedule

Answer(s): A,D,E



The base package usage transaction business object is represented by D2-UsageTransaction. The usage calculation engine or process drives the specifics of the usage to be calculated on this business object.

Based on this, which three configuration areas will have an impact on the usage calculation process? (Choose three.)

  1. VEE rule
  2. TOU map
  3. Usage Rule
  4. Factor Override

Answer(s): B,C,D


Reference:

https://docs.oracle.com/cd/E38983_04/PDF/MDM_Configuration_Guide_v2_1_0_3.pdf






Post your Comments and Discuss Oracle 1Z0-996-22 exam prep with other Community members:

1Z0-996-22 Exam Discussions & Posts