Free 4A0-M01 Exam Braindumps
Alcatel-Lucent IP/MPLS Mobile Backhaul Transport Questions 46–50 (page: 11)

Updated On: 9-Feb-2026

Click on the exhibit



Given the show command result shown and the following information:
· The local Provider Edge (PE) ePipe 300 service uses redundant pseudowires spoke-terminated into Internet Enhanced Service (IES) interfaces on two separate remote PE routers. · Changes made to the service configuration must not affect the operation of other services.
What change can you make to the interconnected services to correct the spoke SDP Egress Label status highlighted?

  1. Enable standby-signalling-master in the ePipe primary spoke SDP binding
  2. Adjust the local PE SDP 1 and 2 SDP path Maximum Transmission Unit (MTUs) to match the IES service MTU
  3. Adjust the remote PE IES spoke interface IP-MTUs to match the ePipe service Virtual Circuit (VC)- MTU
  4. Configure one of the ePipe 300 spoke SDP bindings as endpoint precedence primary

Answer(s): C



Which statement is true concerning aPipe ATM cell mode versus ATM Adaptation Layer (AAL) 5 Service Data Unit (SDU) frame mode?

  1. AAL5 SDU frame mode supports ATM cell concatenation
  2. ATM cell mode can bind multiple virtual circuits to a single service
  3. AAL5 SDU frame mode passes the cell header with the payload
  4. ATM cell mode requires a control word for cell reordering

Answer(s): B



Click on the exhibit



Given the show result shown:
Which example shows the proper format for a Service Access Point (SAP) configured within this service context?

  1. sapbundle-ppp-1/2.1:1/200
  2. sap bundle-ima-2/1.1:1
  3. sap 1/1/1.1:200.20
  4. sap 1/1/6.1:200/20

Answer(s): D



Click on the exhibit



Given the diagram shown, and the following information:
· Configured on CSA1 and the two MLS routers is redundant aPipe 300

· Interchassis Backup Pseudowires (ICB-PW) provide a path of last resort to the Customer Edge (CE) Service Access Points (SAPs)
· Multichassis Automatic Protection Switching (MC-APS) protects the CE access ports · Assume normal status on all aPipe 300 spoke Service Distribution Points (SDPs) If the working OC-3 fails, which three statements correctly describe the resulting status of the MLS1 aPipe 300 endpoint objects (Choose three)

  1. Spoke SDP 1:300 active
  2. Spoke SDP 1:300 standby
  3. Spoke SDP 3:300 active
  4. Spoke SDP 3:300 standby
  5. Spoke SDP 3:301 active
  6. Spoke SDP 3:301 standby

Answer(s): A,D,F



Click on the exhibit



Given the diagram and the following information:
· Virtual Private Routed Network (VPRN) 5 spans the routers Point of Concentration (POC) 3-1 and 3- 2 and the Multilevel Switch (MLS) routers MLS1 and MLS2 · Multiprotocol Border Gateway Protocol (MP-BGP) is configured and operational · Pseudowire status is signaled, as shown, on the ePipe/VPRN spoke Service Distribution Paths (SDPs)

Which statement correctly describes the illustrated services' normal operations?

  1. A failure on the POC3-1 VPRN interface 'to NodeB" will cause a pseudowire switch on the CSA router
  2. A failure on the POC3-2 VPRN interface 'to NodeB" will cause a pseudowire switch on the CSA router
  3. The CSA router sends traffic down both spoke SDPs 1:50 and 2:50 simultaneously
  4. Both POC3-1 and POC3-2 VPRN interfaces "to NodeB" simultaneously forward traffic to the CSA router

Answer(s): A



Viewing page 11 of 31
Viewing questions 51 - 55 out of 150 questions


Post your Comments and Discuss Alcatel-Lucent 4A0-M01 exam prep with other Community members:

AI Tutor AI Tutor 👋 I’m here to help!