A UPS system consists of three modules in a parallel redundant configuration. Each module is rated to provide 200 kW of power.If the electrical load grows from 350 kW to 420 kW, what will happen?

  1. The UPS system will not provide any additional power beyond 400 kW.
  2. The UPS system will reach an overload state and switch to its static bypass.
  3. The UPS system's response will vary depending on the rate of electrical load growth.
  4. The UPS system will continue to support the load and become a capacity configuration.

Answer(s): D



Which UPS configuration has the highest availability?

  1. Capacity
  2. Parallel redundant
  3. Isolated redundant
  4. Distributed redundant

Answer(s): D



Which two should be used as a basis for determining the UPS redundancy configuration? (Choose two.)

  1. Voltage level
  2. Cost of downtime
  3. Availability requirements
  4. Size of the electrical load

Answer(s): B,C



What is the minimum number of UPS modules used in a distributed redundant configuration?

  1. One
  2. Two
  3. Four
  4. Three

Answer(s): D



What is a disadvantage of an 'N' or capacity UPS configuration when compared to the other configurations?

  1. Not scalable
  2. Not redundant
  3. Most difficult to design
  4. Most recent design that is not yet widely accepted

Answer(s): B



Viewing page 19 of 66
Viewing questions 91 - 95 out of 325 questions