Click the Exhibit button.



What does the shaded area in the exhibit represent?

  1. Deferred investment
  2. Waste due to oversizing
  3. Total redundant capacity
  4. Additional power needed

Answer(s): B



Click the Exhibit button.



In the exhibit, which type of power problem is illustrated?

  1. DC offset
  2. Overvoltage
  3. Undervoltage
  4. Harmonic distortion

Answer(s): D



Click the Exhibit button.



In the exhibit, which power problem is illustrated?

  1. DC offset
  2. Voltage fluctuation
  3. Harmonic distortion
  4. Frequency variation

Answer(s): D



Which can cause a swell or surge to occur in the data center's electrical system?

  1. UPS failure
  2. CRAC unit startup
  3. Transformer failure
  4. Sudden load reduction

Answer(s): D



Click the Exhibit button.



Which type of power problem is illustrated in the exhibit?

  1. Harmonics
  2. Overvoltage
  3. Overcurrent
  4. Frequency variation

Answer(s): B