Over the time span of the production plan, large changes in capacity are usually not possible. Additions or subtractions in plant and equipment are impossible or very difficult to accomplish in this period. However, some changes can be done. Which of the following are out of those variations?
- People can be hired and laid off, overtime and short-time can be worked, and shifts can be added or removed.
- Inventory can be built up in slack periods and sold or used in periods of high demand.
- Work can be subcontracted or extra equipment leased
- All of these
Reveal Solution
Next Question