The removal of outliers from demand data to provide a reasonable historical base from which to forecast is called:

  1. regression
  2. time series decomposition
  3. filtering
  4. smoothing

Answer(s): C



Which of the following is used to convert the master production schedule into detail requirements?

  1. production planning
  2. rough-cut capacity planning
  3. production activity control
  4. material requirements planning

Answer(s): D



End-of-line inspection often fails to improve quality for which of the following reasons?

  1. It requires extensive personnel.
  2. It lacks source accountability.
  3. It excludes quality circles.
  4. Its costs are significant

Answer(s): B



Materials should be moved from point of manufacture to point of use when:

  1. production is completed at point of manufacture
  2. the materials are needed at point of use
  3. material handling equipment is available
  4. material at point of use is zero

Answer(s): B



Page 26 of 148



Post your Comments and Discuss APICS CPIM exam with other Community members:

Parsad commented on October 23, 2020
I asked for more discount as I needed to buy 3 exams. They gave me 35% discount The code is 35%OFF for anyone who wants to use.
INDIA
upvote