Arista ACE-A1.2 Exam
Arista Certified Engineering Associate Exam (Page 4 )

Updated On: 19-Jan-2026

Which command below is valid to use as a way to verify the status of the MLAG peer-link?

  1. show mlag
  2. show mlag interface
  3. show mlag peer-link
  4. show mlag detail

Answer(s): A



What is required in order for Multi-Switch CLI to be implemented?

  1. One or more Arista products with management xmpp enabled.
  2. an XMPP-based server such as EJabberd
  3. an instant messaging client such as Admium or Trillian
  4. an SSD drive to the extensive logging produced by this feature.

Answer(s): B



If you were build a large-scale cloud-based architecture that required 100% efficient cell-based fabric, Virtual Output Queuing (VOQ), and 3.84 Tbps capacity per slot, which Arista switch series would be the correct choice?

  1. 7010T
  2. 7500E
  3. 7300
  4. 7150

Answer(s): B



On an Arista switch, what two commands can you use to write your changes from the running-configuration to the startup-configuration?

  1. write
  2. copy running-config startup-config
  3. save
  4. save memory

Answer(s): B,C



When you fullrecover a switch from Aboot and a USB drive is present in the USB port of the switch, which of the following statements is true?

  1. Everything on the USB drive is deleted.
  2. Only Arista-sourced files are copied from the USB drive to flash: and the switch reboots.
  3. If the USB drive contains a fullrecover file and a boot-config file with a timestamp different than the one on USB flash drive, then the USB Drive's contents will be copied to flash, after which the switch will reboot.
  4. Nothing. The USB port is disabled when Aboot is active.

Answer(s): C



Viewing page 4 of 27
Viewing questions 16 - 20 out of 127 questions



Post your Comments and Discuss Arista ACE-A1.2 exam prep with other Community members:

Join the ACE-A1.2 Discussion