The MR manager is unsure whether she wants a Scrum or Kanban board for her project. Identify one difference between the boards.
Answer(s): E
One difference between Scrum and Kanban boards is that only Scrum boards support selecting an estimation method. Estimation is a way of measuring how much work is required to complete an issue or a sprint. Scrum boards allow you to choose between story points, original time estimate, or issue count as estimation methods. Kanban boards do not have estimation methods, as they focus on managing the flow of work rather than planning sprints.
Configuring estimation and tracking, Estimating an issue
An issue was created with the following attributes:· Issue type: Story· Priority: Blocker· Labels: Tools, DevOps· Reporter: A.GrantAn excerpt of the board's swimlane configuration is shown.In which swimlane will the issue appear?
Answer(s): B
The issue will appear in the Expedite swimlane, because it matches the query priority = Blocker. Swimlanes are used to group issues on the board based on a common attribute, such as assignee, epic, or a custom query. The board's swimlane configuration shows that the first swimlane is Expedite, which has the query priority = Blocker. This means that any issue with a blocker priority will be placed in this swimlane, regardless of its other attributes. The other swimlanes have different queries that do not match the issue's attributes, such as type, labels, or reporter. Therefore, the issue will not appear in those swimlanes. The last swimlane is Everything Else, which is the default swimlane for any issue that does not match any of the previous queries. However, since the issue matches the Expedite query, it will not fall into this swimlane either. Hence, the correct answer is B.
[Configuring swimlanes], [Using swimlanes]
Your Scrum board has the following filter query:project in (ENG. DEV) and type in (Bug. Task) ORDER BY Priority ASC You have the necessary permissions but you are unable to drag an issue into a future sprint in the backlog.
Answer(s): D
The reason why you are unable to drag an issue into a future sprint in the backlog is that ranking is disabled. Ranking is a feature that allows you to order issues based on their relative priority or importance. Ranking is enabled by adding "ORDER BY Rank ASC" or "ORDER BY Rank DESC" to your board filter query. Ranking is required for Scrum boards, as it determines the order of issues in your backlog and sprints. If ranking is disabled, you cannot drag and drop issues in your backlog or plan future sprints.
Ranking an issue, Configuring filters
You are viewing a board that displays stories across multiple projects. You want to see a grouping of stories without epics. Which swimlane selection will achieve this?
Answer(s): A
Swimlanes are a way of grouping issues on a board based on certain criteria, such as assignee, priority, query, or epics. If you want to see a grouping of stories without epics, you can use a query swimlane with the condition epic is EMPTY, which will show only issues that are not part of any epic. The other options will either show epics or not group stories at all. Therefore, the correct answer is A.
[Configuring swimlanes], [Advanced searching - fields reference]
Post your Comments and Discuss ATLASSIAN ACP-610 exam with other Community members:
Kumar commented on September 01, 2024 Nice qs and Anonymous upvote
Our website is free, but we have to fight against bots and content theft. We're sorry for the inconvenience caused by these security measures. You can access the rest of the ACP-610 content, but please register or login to continue.