Free ANVE Exam Braindumps (page: 5)

Page 4 of 37

In setting up PTZ control for an Axis encoder, it's very easy to overlook a very important step in the configuration process. After properly connecting the communication wires to the encoder, the next recommended step in the setup is:

  1. Downloading the correct Device ID from the Axis website
  2. Setting the Baud Rate to match the analog PTZ' s
  3. Setting the Device ID to match the analog ID
  4. Uploading the correct PTZ driver

Answer(s): D



Which setting would best adjust a hard yellow tint as shown in the pictures below?

  1. Image contrast

  2. White balance
  3. Color saturation
  4. Image brightness

Answer(s): B



Which is an impact on cameras that are operating above their specified temperature limit?

  1. Noise is increased
  2. Frame rate is reduced
  3. Light sensitivity is decreased
  4. Resolution is reduced

Answer(s): A



Which technology can a Video Management Software (VMS) partner incorporate to reduce the impact on recorded video during server maintenance?

  1. Local storage at the camera
  2. Meta data stream
  3. AXIS Camera Application Platform (ACAP)
  4. SNMP

Answer(s): A






Post your Comments and Discuss Axis Communications ANVE exam with other Community members:

ANVE Discussions & Posts