BICSI RCDD-001 Exam
BICSI Registered Communications Distribution Designer (Page 3 )

Updated On: 1-Feb-2026

Within a commercial office building of 2300 sq m (25000 sq ft), how many building automation system (BAS) devices are required?

  1. 50
  2. 75
  3. 100
  4. 125
  5. 150

Answer(s): C



What is the expected lumenance value, in watts, of a 200 watt fluorescent lamp after three years?

  1. 120 watts
  2. 140 watts
  3. 160 watts
  4. 180 watts
  5. 200 watts

Answer(s): B



Within a heating ventilation and air conditioning automatic control system, what do the letters DDC stand for?

  1. Dual division charger
  2. Direct digital control
  3. Diverse duct center
  4. Direct drive cable
  5. Differential diffuser control

Answer(s): B



What is the expected life cycle, in years, of building automation system within a building structure with a life cycle of 40+ years?

  1. 1 to 2
  2. 2 to 4
  3. 5 to 7
  4. 8 to 12
  5. 12 to 15

Answer(s): C



The ITU-T G.711 standard deals with what aspect of video conferencing?

  1. Coding and compression
  2. File transfer during video conference
  3. Call control during video conference
  4. Voice compression during video conferencing

Answer(s): D



Viewing page 3 of 73
Viewing questions 11 - 15 out of 358 questions



Post your Comments and Discuss BICSI RCDD-001 exam prep with other Community members:

Join the RCDD-001 Discussion