BICSI RCDD-002 Exam
BICSI Registered Communications Distribution Designer - RCDD (Page 7 )

Updated On: 9-Feb-2026

You are renovating telecommunication rooms that support an acute care facility that has 10,000 sq ft floors. The facility will be adding 15,000 sq ft to each of the floors. What is the MINIMUM additional floor space that you will need to expand the TRs to support the new floor space?

  1. 3 m x 3 m (10 ft x 10 ft)
  2. 3.5 m x 4.3 m (11.5 ft x 14 ft)
  3. 3.0 m x 4.5 m (10 ft x 15 ft)
  4. 6 m x 6 m (20 ft x 20 ft)

Answer(s): B



You are designing a nurse call system for a health care facility. The system will have emergency call switches.
What is the first step you should take in designing the nurse call system?

  1. Properly size the supporting TR to accommodate the headend system
  2. Program the headend device for the various call switches that will be used
  3. Perform a risk assessment to determine call switch locations
  4. Perform a site survey to verify the pathways that will connect the headend device with the call switches

Answer(s): C



You are designing a nurse call system for an assisted care facility. What type of nurse call system would best suit the needs for the facility?

  1. Audiovisual system
  2. Staff emergency system
  3. Tone/Visual system
  4. Bedside system

Answer(s): C



If you have a data center where the entire infrastructure must be completely shutdown on an annual basis to perform preventative maintenance and repair work, what tier level would this represent?

  1. Tier I
  2. Tier II
  3. Tier III
  4. Tier IV

Answer(s): A



What is the MAXIMUM horizontal cable length permitted for centralized optical fiber cabling from the MDA within a data center?

  1. 100 m (328 ft)
  2. 200 m (656 ft)
  3. 300 m (984 ft)
  4. 400 m (1312 ft)
  5. 500 m (1640 ft)

Answer(s): C