CORRECT TEXTAn entity manufactures two products.The sales revenues of the products are in the constant mix of 3:1. Forecast data for next period are as follows:The margin of safety for next period is $30,000 of sales revenue. Fixed costs are constant at all levels of output.What is the forecast profit for next period?Give your answer to the nearest whole number.
Answer(s): A
DRAG DROP (Drag & Drop is not supported)A company makes Product A and Product B. The production process for both products uses one type of material, one type of labour, and utilises one machine. All three of these resources will be limited in November. The company has performed a linear programming model and the constraints and optimal solution, to maximise contribution, are as follows:Constraints:For November, which of the above constraints are binding, and which are non-binding?
EFG is a small business making raspberry jam to sell at local markets. It has recently been approached by a major supermarket to produce a special order for the supply of lemon curd.Two of the ingredients required are sugar and preservatives, both of which are in inventory.The sugar has a historic cost of $4 per kg and a replacement cost of $5. It is in regular use for the production of the raspberry jam.The factory has switched to organic processes and the preservatives are no longer required.The historic cost of the preservatives was $3 per kg and the replacement cost is $2.50 per kg.The preservatives can be re-sold to a local competitor for $1 per kg if they are not used in this order.Which TWO of the following should be included in determining the relevant cost of the special order?
Answer(s): B,D
CORRECT TEXTA company makes two products, product X with a contribution per unit of $10 and product Y with a contribution per unit of $4.These products are sold in the mix 3:2 by volume and fixed costs are $38,000 per period.The breakeven point for product Y, based on the expected sales mix is:
Two products being produced by a company require the same material which is limited to 2,600 kgs.What is the optimal production plan?
Post your Comments and Discuss CIMA CIMAPRO19-P01-1 exam dumps with other Community members:
DynamoDB
S3
Cognito
RDS
EFS
/sbin/init
/etc/inittab
/etc/rc.d
/etc/init.d
/lib/init.so
/etc/rc.d/rcinit
/proc/sys/kernel/init
/boot/init
/bin/init
Amazon S3 Intelligent-Tiering
S3 Lifecycle
S3 Glacier Flexible Retrieval
Amazon Athena
Amazon EFS
EC2 instance store
ElastiCache for Redis
S3 Glacier Deep Archive
AWS Lake Formation
Amazon EMR Spark jobs
Amazon Kinesis Data Streams
Amazon DynamoDB
Defender for Endpoint
Defender for Identity
Defender for Cloud Apps
Defender for Office 365
S3 Object Lock
SFTP
AWS Transfer Family
Amazon SQS
API Gateway
Lambda
usage plan
AWS WAF
Amazon ECS
Application Load Balancer
AWS Global Accelerator
Network Load Balancer
EC2
Auto Scaling group
CloudFront
ALB
AWS PrivateLink
CRR
SSE-S3
Athena
SSE-KMS
RDS Custom for Oracle
s3:GetObject
Amazon OpenSearch Service
CloudWatch Logs
Kinesis Data Firehose
Kinesis
S3 bucket
SQS
AWS Lambda
AWS Secrets Manager
AWS Systems Manager OpsCenter
secretsmanager:GetSecretValue
seq
for h in {1..254}
for h in $(seq 1 254); do
Kinesis Data Streams
Amazon Redshift
secrets:GetSecretValue
Our website is free, but we have to fight against AI bots and content theft. We're sorry for the inconvenience caused by these security measures. You can access the rest of the CIMAPRO19-P01-1 content, but please register or login to continue.