Bob is a procurement manager at ABC Ltd. He has been asked to ensure all future purchases achieve `value for money' for the organisation.
What is meant by `value for money'? (5 points). Describe 4 techniques that Bob could use to achieve this (20 points)

  1. See Explanation section for answer.

Answer(s): A

Explanation:

1) A definition of Value for Money: ensuring a purchase is cost effective. This may be that the purchase achieves the 5 Rights of Procurement or that the purchase achieves the 4Es: Economy, Efficiency, Effectiveness and Equity. ­ this is only worth 5 points, so don't spend too long on this
2) 4 techniques Bob can use to achieve VFM: this is the bulk of your essay. Each of the 4 will be worth 5 points, so remember to give a thorough and example. Pick 4 from the list below: complete a value analysis to eliminate non-essential features, minimise variety/ consolidate demand, avoid over specification, pro-active sourcing, whole life costing methodologies, eliminate / reduce inventory, use electronic systems, international sourcing, sustainability / environmental policies, currency/ exchange rate considerations, negotiating good payment terms, packaging, warrantees.

Example Essay:
"Value for money" (VFM) is a concept that refers to obtaining the best possible return on investment or benefits relative to the cost incurred. It involves assessing whether the goods, services, or activities provided offer an optimal balance between their cost and the quality, benefits, or outcomes they deliver. Value for money is not solely about choosing the cheapest option; instead, it considers the overall efficiency, effectiveness, and long-term value derived from an expenditure. For Bob, the Procurement Manager at ABC Ltd there are four key ways that he can achieve this for all future purchases.
Value Engineering
This is looking at the components of a product and evaluating the value of each component individually. You can then eliminate any components that do not add value to the end product. To do this Bob would choose a product to review and determine whether any parts of this can be omitted (thus saving the company money) or could be replaced by components that are of a higher quality at the same price (thus providing added value to the customer). For example, Bob could complete a Value Engineering exercise on the new mobile phone prototype ABC plan to release next year. His findings may discover a way to provide a higher quality camera at no additional cost or that some components don't add value and can be eliminated.
Consolidate demand
Bob can achieve value for money by consolidating demand at ABC ltd. This would mean rather than each individual person/ department ordering what they want when they need it, Bob creates a centralised process for ordering items in bulk for the departments to share. For example, if each department require stationary to be ordered, Bob can consolidate this demand and create one big order each quarter. This will likely result in cost savings for ABC as suppliers often offer discounts for large orders. Moreover, consolidating demand will allow for saving in time (one person does the task once, rather than lots of people doing the same task and duplicating work).

International sourcing
Bob may find there is value for money in changing suppliers and looking at international sourcing. Often other countries outside of the UK can offer the same products at a lower cost. An example of this is manufactured goods from Chin a. By looking at international supply chains, Bob may be able to make cost-savings for ABC. He should be sure that when using this technique there is no compromise on quality.
Whole Life Costing methodology
This is a technique Bob can use for procuring capital expenditure items for ABC. This involves looking at the costs of the item throughout its lifecycle and not just the initial purchase price. For example, if Bob needs to buy a new delivery truck he should consider not only the price of the truck, but also the costs of insurance for the truck, how expensive it is to buy replacement parts such as tyres and the cost of disposing of the truck once it reaches the end of its life. By considering these factors Bob will ensure that he buys the truck that represents the best value for money long term. In conclusion Bob should ensure he uses these four techniques for all items he and his team procures in the future. This will ensure ABC Ltd are always achieving value for money, and thus remain competitive in the marketplace.

Tutor Notes
- This case study is really short, and the ones you'll receive in the exam are often longer and give you more guidance on what they're expecting you to write. With case study questions, you have to make your entire answer about Bob. So don't bring in examples from your own experience, rather, focus on giving examples for Bob.
- A good rule of thumb for case study questions is make sure you reference the case study once per paragraph.
- Value for Money is a really broad topic and you can pretty much argue anything that procurement does is helping to achieve value for money. There's a large table of stuff that's considered VFM on p.38 but that table isn't exhaustive. So feel free to come up with your own ideas for this type of essay.

Some additional tidbits of information on VFM:
- The `academic' definition of Value for Money is `the optimum combination of whole life cost and the quality necessary to meet the customer's requirement'
- Value for Money is an important strategic objective for most organisations but particularly in the public sector. This is because the public sector is financed by public money (taxes), so they must demonstrate that the organisation is using this money wisely. This might be an interesting fact to put into an essay on VFM.
- Value can often be hard to quantify, particularly in the service industry. E.g. in customer service it can be difficult to quantify the value of having knowledgeable and polite employees delivering the service.



Explain, with examples, the three different ways one can categorise procurement spend: direct vs indirect, capital expenditure vs operational expenditure and stock vs non-stock items. (25 points)

  1. See Explanation section for answer.

Answer(s): A

Explanation:

The knowledge to remember:







.

Essay Plan :
Remember to include examples for each of the six categories of spend. This is specifically asked for in the question so it's important to include as many examples as you can. To do this you could take an example organisation such as a cake manufacturer and explain which of their purchases would fall into each category and why.
Introduction ­ explain why procurement categorises spend
- Direct ­ these are items that are incorporated into the final goods (the cakes) so would include raw materials such as flour, eggs, sugar etc
- Indirect ­ these are items that the company needs, but don't go into the end product. For example, cleaning products and MRO supplies for the machines
- Capital Expenditure- these are large one-off purchases, such as buying a new piece of equipment such as a giant oven to cook the cakes.
- Operational Expenditure ­ these are purchases that are required to ensure the business can function day-to-day. They may include PPE for the workers in the factory and cleaning equipment
- Stock items ­ these are items procured in advance and held in inventory until they are needed. In a cake manufacturing factory this could be PPE for staff such as hairnets and gloves. The organisation will buy these in bulk and keep them in a stock cupboard, using these as and when they are required
- Non- stock items - items that are not stored and used right away. An example would be eggs- these will need to be put directly into the cakes as they would go off if bought in advance. Conclusion ­ the categories are not mutually exclusive ­ an item can be direct and operational, or indirect and stock. Different companies may use different systems to classify items of spend.

Example Introduction and Conclusion
Introduction
Procurement categorizes spend to efficiently manage resources and make strategic decisions. Three primary ways of categorizing procurement spend include distinguishing between direct and indirect spend, classifying expenditures as capital or operational, and categorizing items as stock or non- stock. These distinctions aid organizations in optimizing their procurement strategies for better resource allocation.

Conclusion:
In conclusion, categorizing procurement spend into direct vs. indirect, capital vs. operational, and stock vs. non-stock items is essential for strategic resource management.
While these categories provide a structured framework, they are not mutually exclusive, as an item can fall into multiple categories. For example, an item may be both direct and operational or indirect and stock. The flexibility of these categories allows organizations to tailor their procurement strategies based on their specific needs, ensuring efficient resource allocation and effective supply chain management. Different companies may adopt varying categorization approaches depending on their industry, size, and operational requirements.

Tutor notes:
- Because you've got 6 categories of spend to talk about you're only going to need 3-4 sentences for each. Providing you've said the category, explained what it is and given one example, you'll absolutely fly through this type of question
- You could also mention that it is useful to use categories of spend as this helps with budgeting. Different categories may also have different processes to follow for procuring the item (this could form part of your introduction or conclusion).

- This subject is LO 1.3.2 it's quite spread out in the text book but the main info is on p.49
- Note- different companies/ industries classify items of spend differently. Particularly packaging and salaries. Some say they're direct costs and some say they're indirect costs. Honestly, it's a hotly debated subject and I don't think there is a right or wrong. I'd just avoid those two examples if you can and stick to ones that aren't as contentious like eggs and PPE.



Describe the main characteristics of, and differences between, procuring goods, services and construction works (25 points)

  1. See Explanation section for answer.

Answer(s): A

Explanation:

- there are a lot of components to this question so I would take a good 5 minutes to write out some bullet points on the characteristics of each one, and on some differences. Then from your notes make this into an essay. The mark scheme isn't 100% clear on how many characteristics and differences you need to name, so try and keep an equal split between the two areas. You would probably need 2-3 characteristics of each, and 3 differences for a good score.
- Characteristics of goods: tangible, homogeneous, items tend not to perish quickly, can be stored
- Characteristics of services: intangible, heterogenous, inseparable (produced and consumed at the same time), no transfer of ownership, perish upon use (i.e. cannot be stored)

- Characteristics of construction work: project-based procurement, includes procuring both goods and services, complex procurement which has its own set of regulations (CDM2015).
- Differences between these
1) goods are not usually outsourced and services can be.
2) Complexity of the supply chain (goods and construction may have a complex supply chains, but service contracts usually only involve 2 parties).
3) Timescales ­ construction work has a designated timescale but procurement of goods could be a one off or long-term contract, services is usually a long-term contract.

Example Essay
Introduction:
Procurement is a multifaceted field, and understanding the nuances between procuring goods,

services, and construction works is pivotal for effective management. This essay explores the main characteristics that differentiate these categories.
Tangible / Intangible:
Goods are tangible items that can be physically seen and touched. For instance, raw materials like wheat and sugar in a manufacturing organization are tangible goods. On the other hand, services are intangible--though the results can be observed, the service itself cannot be touched. An example is a cleaning contract for a factory; while the effects of the cleaning are visible, the service itself remains intangible. Construction is usually a mixture of tangible and intangible procurement; the tangible is the construction materials such as bricks and windows, and the intangible aspect is the labour to complete the project.
Heterogeneous / Homogeneous:
Goods are generally homogeneous, meaning they are always the same. For example, steel purchased for manufacturing purposes will always be the same. In contrast, services are heterogeneous, varying each time they are rendered. Customer service, for instance, is inherently different each time due to the dynamic nature of customer interactions. Construction could be either heterogeneous or homogeneous depending on the project ­ is it a one off unique building, or is it a large housing estate of same-build properties?
Transfer of Ownership:
When goods are procured, there is a transfer of ownership. The product becomes the property of the buyer upon delivery and payment. In contrast, services do not involve a transfer of ownership as there is no physical entity to transfer. In construction the transfer of ownership is extremely complex and varies depending on the project. Usually the buyer will retain ownership of the land throughout the project, but on some occasions the construction company may take ownership for insurance purposes.
Storable (Separable/ Inseparable):
Goods are storable, allowing for purchase on one day and use on another. For example a factory can buy in plastic to be used to manufacture toys and this is stored in inventory until the time comes to make the toys. However, services are consumed at the point of purchase, making them inseparable. The service is bought and utilized simultaneously. Services cannot be stored. This is the same for construction.
Ability to Outsource:
Goods are rarely outsourced, as they are typically purchased directly from suppliers. Services, on the other hand, can be easily outsourced--examples include outsourcing finance, cleaning, or security services. Construction works are commonly outsourced, with external companies hired to execute projects.
Complexity of the Supply Chain:
Service contracts often involve a simple two-party relationship between the buyer and the supplier. Goods and construction, however, may have complex supply chains. For example, procuring a pen involves a supply chain with various steps, including the raw material supplier, manufacturer, and possibly a wholesaler. Construction works often feature a tiered supply chain with subcontractors playing crucial roles.
Construction as a Hybrid:
Construction procurement represents a hybrid, incorporating elements of both goods and services. It involves hiring a service, such as a bricklayer for laying bricks, while also procuring the tangible goods--bricks. Separating goods from services in construction is challenging, as they are often intertwined, and both aspects are paid for simultaneously.

Conclusion:

In conclusion, distinguishing between the procurement of goods, services, and construction works is essential for effective supply chain management. The tangible or intangible nature, heterogeneity, transfer of ownership, storability, outsourcing potential, and supply chain complexities offer a comprehensive framework for understanding the unique characteristics of each category. Recognizing these distinctions empowers organizations to tailor their procurement strategies to the specific challenges and dynamics associated with goods, services, and construction works.
Tutor Notes
- What a characteristic is can also be a difference. So for example you can say tangible is a characteristic of goods but tangibility is also the main difference between goods and services. So don't worry too much about which order to write stuff in, or doing clear sections for this type of essay. It all comes out in the wash.
- Other differences in procuring these include:
- Costs: procuring goods such as stationary for an office will be low-cost so may not require approval, but a service contract may require management sign off. Procuring construction projects tend to be huge sums of money
- Where the budget comes from: goods and services may be operational expenditure and construction works capital expenditure.
- The level of risk involved in the procurement: goods tends to be quite low risk and construction high risk.
- Types of contract involved: procuring goods may be very simple and just require a PO, services is more complex so may require a formal contract or Deed of Appointment. Construction projects will require a contract due to the high value and high risk of the purchase
- Legislation ­ Goods = Sale of Goods Act, Construction - CDM Regulations 2015. Construction is much more heavily regulated than services or goods. Note CDM regulations isn't part of CIPS. It's occasionally referenced in various modules but you don't have to really know what it is. Just know it's the main legislation governing the construction industry. Construction - Construction Design and Management Regulations 2015 (hse.gov.uk)
- Study guide LO 1.3.1 p. 40, but mainly p. 52 for services. NOTE the title of this learning outcome includes construction and it is hardly mentioned in the study guide. Most of the above information on construction comes from my own knowledge rather than the book.



Provide a definition of a stakeholder (5 points) and describe 3 categories of stakeholders (20 points).

  1. See Explanation section for answer.

Answer(s): A

Explanation:

Essay Plan:
Definition of Stakeholder- someone who has a `stake' or interest in the company. A person or organisation who influences and can be influenced by the company.
Categories of stakeholders:
1) Internal Stakeholders- these people work inside the company e.g. employees, managers etc
2) Connected- these people work with the company e.g. suppliers, mortgage lenders

3) External Stakeholders ­ these people are outside of the company e.g. the government, professional bodies, the local community.

Example Essay:
A stakeholder is an individual, group, or entity that has a vested interest or concern in the activities, decisions, or outcomes of an organization or project. Stakeholders are those who can be affected by or can affect the organization, and they play a crucial role in influencing its success, sustainability, and reputation. Understanding and managing stakeholder relationships is a fundamental aspect of effective organizational governance and decision-making and there are several different types of stakeholders.
Firstly, internal stakeholders are those individuals or groups directly connected to the daily operations and management of the organization. Internal stakeholders are key to success and are arguably more vested in the company succeeding. They may depend on the company for their income / livelihood. Anyone who contributes to the company's internal functions can be considered an internal stakeholder for example:
This category includes
1) Employees: With a direct influence on the organization's success, employees are critical internal stakeholders. Their engagement, satisfaction, and productivity impact the overall performance.
2) Management and Executives: The leadership team has a significant influence on the organization's strategic direction and decision-making. Their decisions can shape the company's future. Secondly, connected stakeholders are those individuals or groups whose interests are tied to the organization but may not be directly involved in its day-to-day operations. Connected stakeholders work alongside the organisation and often have a contractual relationship with the organisation. For example, banks, mortgage lenders, and suppliers. These stakeholders have an interest in the business succeeding, but not as much as internal stakeholders. It is important to keep these stakeholders satisfied as the organisation does depend on them to some extent. For example, it is important that the organisation has a good relationship with their bank / mortgage provider/ supplier as failing to pay what they owe may result in the stakeholders taking legal action against the organisation.
This category includes:
1) Shareholders/Investors: Holding financial stakes in the organization, shareholders seek a return on their investment and have a vested interest in the company's financial performance.
2) Suppliers and Partners: External entities providing goods, services, or collaboration. Their relationship with the organization impacts the quality and efficiency of its operations. Lastly external stakeholders are entities outside the organization that can influence or be influenced by its actions. This category includes anyone who is affected by the company but who does not contribute to internal operations. They have less power to influence decisions than internal and connected stakeholders. External stakeholders include the government, professional bodies, pressure groups and the local community. They have quite diverse objectives and have varying ability to influence the organisation. For example, the government may be able to influence the organisation by passing legislation that regulates the industry but they do not have the power to get involved in the day-to-day affairs of the company. Pressure groups may have varying degrees of success in influencing the organisation depending on the subject matter. This category includes:
1) Customers: With a direct impact on the organization's revenue, customers are vital external stakeholders. Their satisfaction and loyalty are crucial for the company's success.
2) Government and Regulatory Bodies: External entities overseeing industry regulations. Compliance with these regulations is crucial for the organization's reputation and legal standing. In conclusion, stakeholders are diverse entities with a vested interest in an organization's activities.

The three categories--internal, connected and external --encompass various groups that significantly influence and are influenced by the organization. Recognizing and addressing the needs and concerns of stakeholders are vital for sustainable and responsible business practices.
Tutor Notes
- The above essay is pretty short and to the point and would pass. If you want to beef out the essay you can include some of the following information for a higher score:
- Stakeholders can be harmed by, or benefit from the organisation (can affect and be affected by the organisation). For example a stakeholder can be harmed if the organisation becomes involved in illegal or immoral practices- e.g. the local community can suffer if the organisation begins to pollute the local rivers. The local community can also benefit from the organisation through increased employment levels.
- CSR argues organisations should respect the rights of stakeholder groups
- Stakeholders are important because they may have direct or indirect influence on decisions
- The public sector has a wider and more complex range of stakeholders as they're managed on behalf of society as a whole. They're more likely to take a rage of stakeholder views into account when making decisions. However, these stakeholders are less powerful ­ i.e. they can't threaten market sanctions, to withdraw funding, or to quit the business etc.
- The essay doesn't specifically ask you to Map Stakeholders, but you could throw in a cheeky mention of Mendelow's Stakeholder Matrix, perhaps in the conclusion. Don't spend time describing it though- you won't get more than 1 point for mentioning it. You'd be better off spending your time giving lots and lots of examples of different types of stakeholders.
- Study guide p. 58



Page 2 of 11



Post your Comments and Discuss CIPS L4M1 exam with other Community members:

Dominic commented on October 04, 2024
Lots of comments here asking if any one passed this exam. I did pass this exam. It is tough one. Study hard and use these exam questions and answers. You will be able to pass.
UNITED STATES
upvote

Miss Tech commented on October 04, 2024
@Lucas, hi did you pass?and how many questions were in the Exam because l can only see 47Q here on the dumps,???
Anonymous
upvote

Vani commented on October 04, 2024
Very useful
Anonymous
upvote

Priyanka Prasad commented on October 04, 2024
i need questions
Anonymous
upvote

Jack commented on October 03, 2024
are these still legit?
Anonymous
upvote

Ashok Kumar commented on October 03, 2024
Very good content to prep
UNITED STATES
upvote

User commented on October 03, 2024
By far one of the best free sources of exam dumps. I searched google for free braindumps and boom I got this right away.
UNITED STATES
upvote

Vignesh commented on October 03, 2024
I'm writing next week, are the questions still valid?
CZECH REPUBLIC
upvote

Rama commented on October 03, 2024
All looks good.
Anonymous
upvote

Yaron M commented on October 03, 2024
please stop the pain i cant take this anyomre my wife left me and she took the kids its been 54 years and i still cant pass AZ104 please make the suffering stop
Anonymous
upvote

Varon commented on October 03, 2024
The 2 hardest topics of this exams are: 1) Designing Resilient Architectures and 2) Cost-Optimized Architectures By mastering these areas, you’ll be better prepared for tricky exam questions related to resilient and cost-effective architectures.
INDIA
upvote

Haji Momen commented on October 03, 2024
The questions in the exam dumps are pretty same as the real exam the only problem is that it is not complete or has less questions compared to full version. I am from South Africa and this is expensive for me. So I will be using the free version.
South Africa
upvote

Saurabh commented on October 03, 2024
Super Course to go ahead
INDIA
upvote

solla maaten commented on October 03, 2024
just reviewing
Anonymous
upvote

DJ commented on October 03, 2024
This dump is still valid?
MALAYSIA
upvote

senan commented on October 03, 2024
salam bu ne suallardi bele
AZERBAIJAN
upvote

Rk commented on October 03, 2024
Good content
Anonymous
upvote

George commented on October 02, 2024
Focus on mastering designing scalable, resilient architectures and cost-optimization strategies using core AWS services for this SAA-C03 exam.
UNITED STATES
upvote

Esmaiel commented on October 02, 2024
This is a very good practice paper to get ready for exam. Helpful to me.
UNITED STATES
upvote

Fawad commented on October 02, 2024
The exam turned out to be very hard as stated by some users here. So there is no way to pass it unless you know the questions. And note that some of the answers in this exam dump PDF is not correct but the questions are legit.
EUROPEAN UNION
upvote

Moataz commented on October 02, 2024
I approve this exam dump. It is valid in UAE. I passed the test.
UNITED ARAB EMIRATES
upvote

JB commented on October 02, 2024
Thanks for the study material.
Anonymous
upvote

Nisino commented on October 02, 2024
After weeks of cramming and feeling overwhelmed, I ended up using this exam dumps as I badly needed to pass and it worked.
Netherlands
upvote

Hades commented on October 02, 2024
i hope this will help me pass
VIET NAM
upvote

Saboor commented on October 01, 2024
The answer to comment questions here: 1- Yes, The exam and it is very hard. 2- Yes, I passed this exam. But I did not just rely on this exam dumps but I had studied. Though I got most of these questions in my test. Good luck guys.
UNITED STATES
upvote

cota commented on October 01, 2024
não entendi
BRAZIL
upvote

Fakhro commented on October 01, 2024
Single try and passed. So good and usable document.
GERMANY
upvote

Chandra commented on October 01, 2024
The full version of this document is in PDF and well formatted. I purchased it because it has more questions compare to this free version.
INDIA
upvote

hassan commented on October 01, 2024
Hoping the Dumps will help
CANADA
upvote

Fred commented on October 01, 2024
Thank you for putting together these questions. The PDF was great but the test engine needs a lot of enhancement.
UNITED KINGDOM
upvote

Solomon commented on October 01, 2024
I passed the SAAC03 on Saturday. These guys are doing a great job on this platform and they deserve the credit. Their questions are valid and thoroughly reviewed. I recommend subscribing to Freebrain dumps
Anonymous
upvote

Jeff commented on October 01, 2024
Question 11 is Form Choice (Answer D) - explanation is examining the answer
CANADA
upvote

Cleo commented on October 01, 2024
great resource, for the exams Ireland
Anonymous
upvote

shilpa commented on October 01, 2024
hi neee help in preparation of my exam
Anonymous
upvote