Cisco 300-415 Exam
Implementing Cisco SD-WAN Solutions (ENSDWI) (Page 4 )

Updated On: 1-Feb-2026

How is the software managed in Cisco SD-WAN?

  1. Software upgrade operation in the group must include vManage, vBond, and vSmart.
  2. Software downgrades are unsupported for vManage.
  3. Software images must be uploaded to vManage through HTTP or FTP.
  4. Software images must be transferred through VPN 512 or VPN 0 of vManage.

Answer(s): B



Which two performance data details are provided by Cisco SD-WAN vAnalytics? (Choose two.)

  1. certificate authority status (health and expiration dates) for all controllers
  2. application quality of experience score from zero to ten
  3. details on total cost of ownership for the fabric
  4. jitter, loss, and latency for data tunnels
  5. view devices connected to a vManage NMS

Answer(s): B,D



An engineer modifies a data policy for DIA in VPN 67. The location has two Internet-bound circuits. Only the web browsing traffic must be admitted for DIA, without further discrimination about which transport to use.

Here is the existing data policy configuration:

Which policy configuration sequence meets the requirements?





Answer(s): C



Which two architectural components are part of an SD-WAN high availability vManage cluster? (Choose two.)

  1. network configuration system
  2. WAN Edge router
  3. NAT router
  4. messaging server
  5. application server

Answer(s): A,E



What is the order of operations for software upgrades of Cisco SD-WAN nodes?

  1. vBond, vManage, vSmart, WAN Edge
  2. vManage, vBond, vSmart, WAN Edge
  3. vManage, vBond, WAN Edge, vSmart
  4. vManage, vSmart, vBond, WAN Edge

Answer(s): B



Viewing page 4 of 82
Viewing questions 16 - 20 out of 502 questions



Post your Comments and Discuss Cisco 300-415 exam prep with other Community members:

Join the 300-415 Discussion