The load step of ETL is physically storing or presenting the results of the transformation in the target system.
Answer(s): A
A synonym for transformation in ETL is mapping. Mapping is the process of developing the lookup matrix from source to target structures, but not the result of the process.
Answer(s): B
Change Data Capture is a method of reducing bandwidth by filtering to include only data that has been changed within a defined timeframe.
There are three techniques for data-based change data capture, namely:
Answer(s): A,C,E
Latency can be:
Answer(s): A,C,D
Post your Comments and Discuss Dama DMF-1220 exam prep with other Community members:
Our website is free, but we have to fight against AI bots and content theft. We're sorry for the inconvenience caused by these security measures. You can access the rest of the DMF-1220 content, but please register or login to continue.