Free D-PSC-MN-01 Exam Braindumps

Which three F200 components can a customer replace?

  1. System Battery
  2. Network Interface Card
  3. CPU module
  4. DIMM
  5. NVDIMM Battery

Answer(s): A,B,D

Explanation:

When it comes to the Dell PowerScale F200 node, customers are allowed to replace certain components classified as Customer Replaceable Units (CRUs). The components that customers can replace on the F200 node include:
A . System Battery
B . Network Interface Card (NIC)
D . DIMM (Memory Modules)

Customer Replaceable Units (CRUs):
CRUs are components that customers can replace themselves without the need for a Dell technician. Replacing CRUs allows for quicker resolution of hardware issues and reduces system downtime.
Components Customers Can Replace on F200:
System Battery:
The system battery, often a CMOS battery, maintains the system's BIOS settings when the node is powered off.
It's a CRU because it's easily accessible and can be replaced without specialized tools or training.


Reference:

Dell EMC PowerScale F200 Hardware Owner's Manual, Section on Replacing the System Battery.
Network Interface Card (NIC):
NICs are modular and can be swapped out if they fail or need upgrading. Customers can replace NICs to change network configurations or repair faulty interfaces.
Dell EMC PowerScale F200 Installation and Service Guide, Chapter on Replacing a Network Interface Card.
DIMM (Memory Modules):
Memory modules are accessible components that can be added or replaced to adjust the node's memory capacity.

Customers can replace faulty DIMMs or upgrade to larger capacities as needed.
Dell EMC PowerScale F200 Service Guide, Section on Memory Replacement Procedures. Components Customers Cannot Replace (Field Replaceable Units - FRUs):
CPU Module:
The CPU module is a FRU and should only be replaced by authorized Dell service personnel. Replacing CPUs requires specialized tools and procedures to ensure proper handling and thermal management.

Dell EMC PowerScale F200 Service Procedures, stating that CPU replacement is not a customer task.
NVDIMM Battery:
NVDIMM batteries are associated with non-volatile memory modules and are critical for data integrity.
They are considered FRUs due to the complexity and potential impact on data if not handled correctly.

Dell EMC PowerScale F200 Hardware Owner's Manual, indicating NVDIMM battery replacement is a service task.
Dell PowerScale Reference
Dell EMC PowerScale F200 Hardware Owner's Manual:
Provides detailed information on hardware components and replacement procedures.

Dell EMC PowerScale F200 Installation and Service Guide:
Outlines the steps for installing and servicing the F200 node, including CRU replacements.

Dell EMC Knowledge Base Articles:
Article ID 000103456: "Customer Replaceable Units for PowerScale F200 Nodes" Article ID 000103457: "Guidelines for Replacing Components on PowerScale Nodes"



A customer is planning to expand a Dell PowerScale Gen5 cluster with H500 nodes What is a consideration?

  1. A minimum of three H500 chassis are needed.
  2. All new nodes must be on the network.
  3. A minimum of four H500 nodes are needed.
  4. A minimum of one H500 chassis is needed.

Answer(s): D

Explanation:

When expanding a Dell PowerScale Gen5 cluster with H500 nodes (which are Gen6 nodes), a key consideration is that a minimum of one H500 chassis is needed, which contains four H500 nodes.

Understanding Dell PowerScale Node Generations:
Gen5 Cluster:
Existing cluster with Gen5 nodes.
H500 Nodes:
Part of the Gen6 family, which introduces a new hardware architecture and chassis design.

Gen6 Chassis and Node Configuration:
Chassis Design:
Gen6 nodes like the H500 are installed in a chassis that holds four nodes. The chassis is the physical enclosure that houses and powers the nodes.
Minimum Node Addition:
You cannot add individual Gen6 nodes to a cluster; you must add at least one full chassis. Therefore, the minimum number of H500 nodes you can add is four, as part of a single chassis.
Considerations When Expanding with H500 Nodes:
Compatibility:
OneFS allows mixing Gen5 and Gen6 nodes in the same cluster, but certain considerations apply.
Network Connectivity:
New nodes must be properly connected to the cluster's internal network.
Chassis Requirements:
A minimum of one H500 chassis (containing four nodes) is required for expansion.
Why Option D is Correct:
Option D:
"A minimum of one H500 chassis is needed."
This accurately reflects the requirement to add at least one chassis (four nodes) when expanding the cluster.
Why Other Options Are Less Suitable:
Option A:
"A minimum of three H500 chassis are needed."
This would require adding 12 nodes, which is not the minimum requirement.
Option B:
"All new nodes must be on the network."
While it's true that nodes must be networked, this is a standard practice and not a specific consideration in this context.
Option C:
"A minimum of four H500 nodes are needed."
While technically correct in terms of node count, the key consideration is the chassis requirement, making Option D more precise.
Dell PowerScale Reference
Dell EMC PowerScale OneFS Node and Chassis Overview:
Describes the architecture of Gen6 nodes and chassis requirements.

Dell EMC PowerScale OneFS Administration Guide:
Provides guidelines on expanding clusters and adding new nodes.
Knowledge Base Articles:
Article ID 000114567: "Expanding Gen5 Clusters with Gen6 Nodes" Article ID 000114568: "Understanding Gen6 Chassis and Node Requirements"



An engineer wants to create a 4-node cluster after rack and stack.
What port must they use to start the installation?

  1. COM
  2. FE
  3. BE
  4. iDRAC

Answer(s): D

Explanation:

When an engineer wants to create a 4-node cluster after rack and stack, they must use the iDRAC (Integrated Dell Remote Access Controller) port to start the installation.

Understanding iDRAC:
Remote Management:
iDRAC provides out-of-band management capabilities, allowing administrators to manage and monitor nodes remotely.
Virtual Console Access:
Offers a virtual console for accessing the node's BIOS and performing installations.
Initial Cluster Setup with iDRAC:
Accessing the Node:
Connect to each node's iDRAC interface using its IP address.
Starting the Installation:
Use the iDRAC virtual console to interact with the node as if you were physically present.
Benefits:
No need for physical access to the COM port or direct console connections. Allows for remote configuration and reduces the time required for setup.
Why iDRAC is Used Over Other Ports:
COM Port:
The COM (serial) port can be used for initial setup, but it requires physical access and serial cables. Less convenient compared to iDRAC's remote capabilities.
FE (Front-End) and BE (Back-End) Ports:
FE and BE ports are used for data network connections, not for initial setup or management. The initial configuration cannot be performed through these ports.
Procedure for Using iDRAC:
Step 1: Connect to iDRAC
Ensure that iDRAC network interfaces are connected and configured with IP addresses.
Access iDRAC via a web browser using the IP address.
Step 2: Launch Virtual Console

Log in to the iDRAC interface.
Launch the virtual console to access the node's system interface.
Step 3: Perform Initial Configuration
Use the virtual console to run the OneFS installation wizard. Configure cluster settings, networking, and other parameters.
Dell PowerScale Best Practices:
Using iDRAC for Installation:
Recommended for its convenience and efficiency.
Allows for consistent setup procedures across multiple nodes.
Network Preparation:
Ensure iDRAC interfaces are properly connected to the management network. Verify network settings to allow access from the engineer's workstation.

Dell PowerScale Reference
Dell EMC PowerScale OneFS Installation Guide:
Provides detailed steps on installing OneFS using iDRAC.

Dell EMC PowerScale Networking Guide:
Discusses management network configurations, including iDRAC setup.

Dell EMC iDRAC User's Guide:
Offers comprehensive information on using iDRAC features.

Knowledge Base Articles:
Article ID 000125678: "Initial Cluster Configuration Using iDRAC" Article ID 000125679: "Best Practices for Remote Installation on PowerScale Nodes"



Which are configured during the Configuration Wizard process?

  1. Contact information Secure Remote Services
  2. SmartConnect LDAP
  3. Date and time Secure Remote Services
  4. Date and time Encoding setting

Answer(s): C

Explanation:

When running the Configuration Wizard during the initial setup of a Dell PowerScale cluster, certain key configurations are required to ensure the cluster operates correctly. The Configuration Wizard specifically prompts for settings related to Date and time and Secure Remote Services (formerly known as ESRS - EMC Secure Remote Services).

Date and Time Configuration:
Purpose:
Setting the correct date and time is crucial for log accuracy, system operations, and security protocols.
Ensures synchronization across the cluster nodes and with external systems.

Configuration Steps:
The wizard prompts for the time zone selection.
Allows setting of the date and time manually or configuring NTP (Network Time Protocol) servers for automatic synchronization.


Reference:

Dell EMC PowerScale OneFS Configuration Guide, Chapter on Initial Cluster Configuration.
Secure Remote Services Configuration:
Purpose:
Secure Remote Services enables secure, remote support capabilities. Allows Dell Support to proactively monitor the cluster for issues and provide remote assistance.
Configuration Steps:
The wizard asks whether to enable Secure Remote Services.

Requires input of network settings and proxy information if applicable. May prompt for registration details to connect with Dell Support.

Dell EMC PowerScale OneFS Configuration Guide, Section on Secure Remote Services Setup. Dell EMC Secure Remote Services (ESRS) Gateway Installation and Configuration Guide.
Why Other Options Are Less Suitable:
A . Contact information, Secure Remote Services:
While contact information is important, it is typically configured after the initial setup, not during the Configuration Wizard.
Secure Remote Services is configured during the wizard, but contact information is not a required step at that point.
B . SmartConnect, LDAP:
SmartConnect:
SmartConnect is a feature for load-balancing client connections.
While networking is configured during the wizard, detailed SmartConnect settings are usually configured post-initial setup.
LDAP:
LDAP (Lightweight Directory Access Protocol) is used for directory services. LDAP configuration is typically performed after the initial cluster setup through the OneFS web interface or CLI, not during the Configuration Wizard.
D . Date and time, Encoding setting:
Encoding Setting:
Encoding settings for file systems (e.g., UTF-8) are not configured during the initial Configuration Wizard.
They are set when creating access zones or configuring protocols, which occurs after the initial setup.
Dell PowerScale Reference
Dell EMC PowerScale OneFS Quick Start Guide:
Provides step-by-step instructions for initial cluster setup using the Configuration Wizard.
Dell EMC PowerScale OneFS Quick Start Guide
Dell EMC PowerScale OneFS Web Administration Guide:
Details on configuring system settings, including date and time, and Secure Remote Services.
Dell EMC PowerScale OneFS Web Administration Guide
Knowledge Base Articles:
Article ID 000123456: "Configuring Date and Time Settings During Initial Setup" Article ID 000123457: "Enabling Secure Remote Services in the Configuration Wizard"