A PowerProtect DD system is configured for VTL. The backup application requires a minimum tape capacity of 800 GB.What is the minimum tape type to support this requirement?
Answer(s): D
https://www.delltechnologies.com/asset/en-us/products/data-protection/technical-support/docu95865.pdf (359)
DRAG DROPWhat is the order of steps to configure DD Boost on the backup host?Exhibit A:Exhibit B:
Answer(s): A
For the backup host:1. License the backup software for DD Boost as required by the software manufacturer.2. Create devices and pools through the management console/interface.3. Configure backup policies and groups to use the Data Domain system for backups with DD Boost.4. Configure clone or duplicate operations to use Data Domain managed replication between Data Domain systems.
DRAG DROPWhat is the correct sequence of steps to configure storage for Dell EMC Cloud Tier in the DD System Manager?Exhibit A:Exhibit B:
A customer needs an upgrade on their DD6900 to use HA.Which expansion shelf is required?
https://docplayer.net/195500638-Dell-emc-powerprotect-dd6900-system.html (61)
When using the DD VTL Tape Out to Cloud feature, which status will a tape show once it is in the cloud tier vault?
Post your Comments and Discuss Dell DES-DD23 exam prep with other Community members:
Our website is free, but we have to fight against AI bots and content theft. We're sorry for the inconvenience caused by these security measures. You can access the rest of the DES-DD23 content, but please register or login to continue.