Esri EADP19-001 Exam Questions
ArcGIS Desktop Professional 19-001 (Page 6 )

Updated On: 21-Feb-2026

An ArcGIS user needs to create a map of flood zones for an insurance company. The user has a choice of four elevation data sets to perform the analysis

- USGS 30-meter DEM
- SRTM 90-meter DEM
- Lidar 5-meter DEM
- 30-meter DEM derived from stereo imagery

Which type of elevation dataset will create the most accurate flood zones?

  1. USGS 30 meter DEM
  2. SRTM 90 meter DEM
  3. Lidar5-meter DEM
  4. 30-meter DEM derived from stereo imagery

Answer(s): A



A school bus dispatcher needs to create a bus route that stops at student homes during specific time ranges. Which Network Analyst setting should the dispatcher use to accomplish this task?

  1. Impedance Time
  2. Time Windows
  3. Start Time
  4. Time Accumulation

Answer(s): B



An ArcGIS user is creating a script tool to automate a common workflow. Which tool property ensures that the tool only recognizes intended feature data sources?

  1. output spatial reference property
  2. data type fitter property
  3. workspace data property
  4. data extent property

Answer(s): C



When rematching geocoding results, a user notices that E St Is being interpreted as East St. How snould a user resolve this Issue for future geocoding?

  1. remove the entry defining E to mean east In the geocoding XML files
  2. recreate the address locator with new reference data
  3. create a composite address locator where E is not recognized as east
  4. change E to east in the input table to be geocoded before geocoding

Answer(s): C



An ArcGIS user in a county office receives a large volume of data In shapefiles, coverages and table formats. The user is responsible for converting the data to a standard feature class format and writing it into a central enterprise geodatabase. The data must be simultaneously available for editing and spatial analysis tasks.
How should the Windows Task Scheduler be used to achieve these goals?

  1. schedule to run a geoprocessing service with (he [asks and maintain log of script validation errors
  2. schedule to run a geoprocessing service with the tasks and allocate a specific lime to run each task in the service
  3. patch the tasks in a script and schedule to run the script at a scheduled time at non-peak hours
  4. patch the tasks In a model and schedule to run the model at a scheduled time at non-peak hours

Answer(s): B






Post your Comments and Discuss Esri EADP19-001 exam dumps with other Community members:

Join the EADP19-001 Discussion