Management has requested a 15-minute battery bank assuming full load on the UPS. The UPS vendor has provided the following specifications of the UPS:
· Rated power: 30 kVA
· Rectifier input voltage: 400 V/3 phase
· Rectifier input power factor: 0.8
· Battery rated voltage: 384 V
· Number of cells: 192
· End of discharge voltage: 308 V
· Inverter output voltage: 400 V/3 phase
· Inverter output power factor: 0.8
What information is missing to perform the battery calculation?

  1. UPS efficiency
  2. Inverter efficiency
  3. Load imbalance on the phases
  4. Available battery charging current

Answer(s): A

Explanation:

To determine the required capacity of the battery bank for the 15-minute runtime at full load, one must know the total power requirement that the battery bank must supply. The specifications provided include most of the necessary details, such as rated power, input voltage, battery voltage, and discharge voltage. However, one critical piece of information is missing: the UPS efficiency.

Detailed
In a data center UPS system, the battery bank is designed to supply power for a set duration when there is an input power failure. The UPS efficiency affects the actual power the UPS can deliver to the load compared to the power it draws from the batteries. The efficiency factor is necessary to accurately calculate the required capacity of the battery bank since it determines how much input power is needed from the batteries to supply the load at full capacity. The formula typically used to determine battery capacity involves factoring in UPS efficiency, as it allows you to understand the losses within the UPS system.
If UPS efficiency is not considered, there would be an inaccurate estimation of the actual power needed from the batteries. For instance, if a UPS has 90% efficiency, only 90% of the power drawn from the batteries reaches the load. Without knowing this efficiency, it is not possible to calculate the battery bank size accurately, as you cannot accurately estimate the losses within the UPS itself.

EPI Data Center Specialist


Reference:

According to EPI Data Center Specialist training, understanding the UPS efficiency is essential for battery sizing. Without it, the calculations could lead to either undersizing or oversizing the battery bank, which affects both reliability and cost-effectiveness of the UPS system. The EPI Data Center Specialist course emphasizes that battery sizing must account for all losses within the UPS system, with efficiency being a primary factor in these calculations.



The pipes of a VESDA smoke detection system are installed at the air intake of the air conditioner inside the computer room.
Is this a good practice from an early smoke detection point of view?

  1. It depends on the type of gas-based fire suppression which will be installed.
  2. Yes, as this reduces the amount of piping to be installed in the data center, as all air will go through the air conditioner.
  3. No, the piping should be installed at the air exhaust of the air conditioner, as there can also be a fire inside the air conditioner itself.
  4. No, it will give a longer reaction time for the smoke detection system and there might also be bypass airflow.

Answer(s): D

Explanation:

For optimal early smoke detection in a data center, it is crucial that the Very Early Smoke Detection Apparatus (VESDA) system be installed at locations where smoke will be detected as soon as it appears. Positioning the VESDA pipes at the air intake of the air conditioner inside the computer room is not ideal. This placement could result in a delayed detection response and the potential for bypass airflow to occur, which would impede the system's ability to detect smoke effectively.
Detailed
When VESDA pipes are installed at the air intake, the detection system relies on the smoke to be drawn into the air conditioning unit before detection can occur. This setup increases the reaction time as the smoke has to travel through the intake and get processed by the air conditioner. Furthermore, bypass airflow--a phenomenon where not all the air containing smoke particles passes through the VESDA pipes--could also delay or even prevent the system from detecting smoke early. Ideally, VESDA pipes should be positioned where smoke is likely to accumulate first, such as near the ceiling or in the return airflow path to detect smoke at the earliest possible stage. This ensures that the detection system can quickly trigger alarms, providing more time to address potential fire hazards.
EPI Data Center Specialist


Reference:

EPI Data Center Specialist training highlights that smoke detection should prioritize early response capabilities to maximize safety. The preferred installation for VESDA pipes is generally at points where smoke would naturally accumulate, rather than relying on air conditioning intakes where airflow can vary and delay detection. In their course materials, EPI emphasizes minimizing reaction time and reducing the impact of airflow dynamics on smoke detection efficiency.



You need to determine the strategy for the cooling audit. All the servers are based on a front-to-rear (F-R) airflow design.
Which location for the temperature/humidity measurement should you recommend for the audit?

  1. At the back/rear of the server at 50 mm/2 inch
  2. At 1.5 meters/5 feet above the floor in the middle of the cold aisle
  3. At the front/intake of the server at 50 mm/2 inch
  4. At 1.5 meters/5 feet above the floor in the middle of the hot aisle

Answer(s): C

Explanation:

For a cooling audit in a data center, it is essential to measure temperature and humidity where air enters the servers to accurately assess cooling performance. In this case, since all servers have a front-to-rear (F-R) airflow design, measuring at the front/intake of the server will provide a precise understanding of the cooling conditions that the equipment is experiencing.
Detailed
Servers with a front-to-rear airflow design draw in cool air from the cold aisle at the front, which is then exhausted into the hot aisle at the rear. By measuring temperature and humidity 50 mm/2 inches from the front intake, you gather data on the air conditions right before it enters the servers, providing an accurate representation of the cooling environment as it directly impacts the equipment.
Measuring in the cold aisle at the front intake ensures that the readings reflect the actual conditions of the incoming air that the servers depend on for effective cooling. This approach is consistent with best practices for maintaining thermal conditions in a data center, as it helps confirm that the cooling systems are delivering air within the required temperature and humidity specifications.
EPI Data Center Specialist


Reference:

According to the EPI Data Center Specialist curriculum, the optimal placement for temperature and humidity sensors is at the intake of the equipment in the cold aisle, as it directly correlates to the environmental conditions affecting the servers. This positioning allows for a more effective audit of cooling performance, which is critical for maintaining the reliability and efficiency of the data center's operations.



You are installing new copper cabling.
What is the advantage or disadvantage of choosing pre-terminated category 6 or 6A cabling?

  1. Pre-terminated cabling is already factory tested and saves installation time.
  2. There is no advantage as most new copper cabling network designs are based on category 3 or 5E for horizontal cabling.
  3. Pre-terminated cabling has a higher fire rating.
  4. Pre-terminated cabling makes ordering of the copper cables more complex, as you need to know in advance on which side the male or female connector needs to be located.

Answer(s): A

Explanation:

Choosing pre-terminated category 6 or 6A cabling provides several advantages, primarily related to time savings and reliability. Since pre-terminated cables are factory tested, they ensure consistent quality and performance, reducing the need for additional testing during installation. This makes installation faster and more efficient, which can significantly reduce labor costs and deployment times.

Detailed
Pre-terminated cabling systems are manufactured and tested in controlled environments, which ensures they meet industry standards for performance. This factory testing process minimizes the likelihood of faults, reducing the need for troubleshooting and retesting on-site. Moreover, pre- terminated solutions can help to streamline installations because they eliminate the need for on-site terminations, which can be time-consuming and require skilled labor.

This is especially beneficial for data centers, where rapid deployment and minimizing potential points of failure are critical to maintaining uptime. However, it is important to note that pre- terminated cables require accurate planning, as lengths and connector configurations must be predetermined.

EPI Data Center Specialist


Reference:

According to EPI Data Center Specialist guidelines, pre-terminated cabling is advantageous in data center environments due to reduced installation time and enhanced reliability from factory testing. These attributes align with best practices for efficient data center management, where maintaining performance and minimizing downtime are priorities.



Page 1 of 16



Post your Comments and Discuss EXIN CDCS exam with other Community members:

Humtet commented on November 23, 2024
Very helpful and informative
CANADA
upvote

Oga commented on November 23, 2024
Graet very helpful
CANADA
upvote

kspp commented on November 23, 2024
Good Material
UNITED STATES
upvote

Saurabh commented on November 23, 2024
These are good dumps
UNITED STATES
upvote

cron commented on November 23, 2024
care to share those who bought this exam guide? more power
Anonymous
upvote

Lakshminarsimhan.R commented on November 23, 2024
The questions and answers are good in this portal, kindly please add comments as well for answers, so that it will be very hepful.
Anonymous
upvote

Naredn commented on November 22, 2024
Best practices at one place
Anonymous
upvote

max commented on November 22, 2024
thanks, i appreciate it
CANADA
upvote

Fefe commented on November 22, 2024
Great so far
Anonymous
upvote

sami commented on November 22, 2024
is the quation real exam?
GERMANY
upvote

sami commented on November 22, 2024
is The Quation from real exam or not
GERMANY
upvote

sam commented on November 22, 2024
practice for cad
RESERVED
upvote

James commented on November 21, 2024
I love this
CANADA
upvote

siii commented on November 21, 2024
great resources for exam
INDIA
upvote

Tom commented on November 21, 2024
Can anyone confirm if these questions are still valid?
SOUTH AFRICA
upvote

Harshit Soni commented on November 21, 2024
Good explanation
INDIA
upvote

Devopsengineer commented on November 21, 2024
review my knowledge to take an exam
UNITED STATES
upvote

gopu singh commented on November 21, 2024
ok ok ok ok
INDIA
upvote

huiyi commented on November 21, 2024
Great dumps to practice
Anonymous
upvote

Harshit Soni commented on November 21, 2024
Questions looks technical and authentic
INDIA
upvote

FN commented on November 21, 2024
Great work team!
ITALY
upvote

raj commented on November 20, 2024
it is good comare to other sites
Anonymous
upvote

bpop commented on November 20, 2024
@Patak when did you take the exam?
UNITED STATES
upvote

Rab commented on November 20, 2024
Useful reference
Anonymous
upvote

Pallavi commented on November 20, 2024
Preparing for certification
EUROPEAN UNION
upvote

John Okediji commented on November 20, 2024
I like it. It's helping me prepare well for my exam.
Anonymous
upvote

aam commented on November 20, 2024
great lesson
Anonymous
upvote

Ajay commented on November 20, 2024
Best exam questions & answers
Anonymous
upvote

Diago commented on November 19, 2024
Unless you use these so called exam dumps to prepare for your exam you are not going to be able to pass your exam. The questions are tricky, confusing and very hard.
Brazil
upvote

Soman commented on November 19, 2024
Hay Guys, I just got my first certificate. This exam dumps worked well... but I also studied prior to coming across this site.
UNITED KINGDOM
upvote

Mike commented on November 19, 2024
In my opinion, they work well for me, but it depends on how you approach them. My method isn't about memorizing the exact questions and answers from the practice tests to use on the real exam. Instead, I focus on understanding why I got certain questions wrong so I can deepen my comprehension of the material.
EUROPEAN UNION
upvote

Mohan commented on November 19, 2024
I did not want to not to book my test and walk into a test center without being prepared as this exam is very hard. So I studied and used the full/paid version of these questions and passed my exam.
India
upvote

Shu commented on November 19, 2024
Considerably good.
UNITED STATES
upvote

Ji commented on November 19, 2024
Gute Vorbereitung auf DITS
GERMANY
upvote