F5 F50-513 Exam
F50-513 BIG-IP GTM V9.3 (Page 2 )

Updated On: 12-Jan-2026

Which two ports must be enabled to establish communication between GTM Systems and other BIG-IP Systems? (Choose two.)

  1. 22.
  2. 53.
  3. 443.
  4. 4353.
  5. 4354.

Answer(s): A,D



When initially configuring the GTM System using the config tool, which two parameters can be set? (Choose two)

  1. System hostname
  2. IP Address of management port.
  3. IP Address of the external VLAN.
  4. Defult route for management port.
  5. Port lockdown of management port.

Answer(s): B,D



If the config tool is complete, which three access methods are available by default for GTM administration and configuration on 520/540 platforms?(Choose three.)

  1. network access via http.
  2. network access via https.
  3. network access via telnet.
  4. network access via serial port.
  5. network access via keyboard and monitor.

Answer(s): B,D,E



What must be sent to the license server to generate a new license?

  1. the system’s dossier.
  2. the system’s base license.
  3. the system’s serial number.
  4. the system’s purchase order number.

Answer(s): A



Viewing page 2 of 14
Viewing questions 5 - 8 out of 49 questions



Post your Comments and Discuss F5 F50-513 exam prep with other Community members:

Join the F50-513 Discussion