Range Charts are the technique used to determine if Special Causes are occurring within the subgroups of the __________.

  1. Histograms
  2. SPC Charts
  3. NP Charts
  4. Pareto Charts

Answer(s): B



When a Belt Poka-Yoke’s a defect out of the process entirely then she should track the activity with a robust SPC system on the characteristic of interest in the defect as an early warning system.

  1. True
  2. False

Answer(s): B



Following the completion of a LSS project the Belt not only creates a Control Plan he also develops a _____________so those involved in the process know what to do when the critical metrics move out of spec.

  1. Response Plan
  2. Call List
  3. Chain-of-Command
  4. Defect Analysis Plan

Answer(s): A



Upon completion and validation of an improvement to a process a Belt and the Project Team create a Control Plan that contains which of these?

  1. Standard operating work description of the process change
  2. Description of the monitoring system in place to assure continued compliance
  3. Summary of the targeted critical metrics for process performance measurement
  4. All of the above

Answer(s): D