Range Charts are the technique used to determine if Special Causes are occurring within the subgroups of the __________.
Answer(s): B
When a Belt Poka-Yoke’s a defect out of the process entirely then she should track the activity with a robust SPC system on the characteristic of interest in the defect as an early warning system.
Following the completion of a LSS project the Belt not only creates a Control Plan he also develops a _____________so those involved in the process know what to do when the critical metrics move out of spec.
Answer(s): A
Upon completion and validation of an improvement to a process a Belt and the Project Team create a Control Plan that contains which of these?
Answer(s): D