Your customer has completed a successful Synergy Proof of Concept (PoC) consisting of a single frame with dual composers and dual Virtual Connect SE 40Gb F8 modules.
The customer wants to:
-add a second frame before they move into production
-have unified management
-have a separate logical enclosure for each frame
What are the basic steps to add the second frame? (Choose three.)
- Move the standby composer to the second frame.
- Disconnect the existing management ring, and then cable the FLM (frame link module) in the first frame to the FLMs in the second frame.
- Install a satellite module in the first frame.
- Move the bottom VC module from the first frame to the second.
- Move one of the uplinks from the FLM in the first frame to a FLM in the second.
Reveal Solution Next Question