Your customer plans to deploy VMware ESXi 7 0 U2 and they are looking for a hardware platform mat wilt allow them to use up to 24 TB of physical memory.
Which HPE compute system meets this customer's requirements?

  1. HPE ProLiant DL380 Gen 10 Plus
  2. HPE Synergy 480 Gen10 Plus
  3. HPE ProLiant DL560 Gen10
  4. HPE Superdome Flex 280

Answer(s): A



Which compute node parameters are captured within server hardware type?

  1. Number of the CPUs
  2. installed operating system
  3. Mezzanine card configuration
  4. Size of the memory Installed

Answer(s): B



Your customer has 6 logical enclosures spanning 18 HPE Synergy frames. The customer needs to add one more logical enclosure based on 5 HPE Synergy frames How will this change impact the customer environment?

  1. The customer can add a new logical enclosure to the existing setup because the maximum number of logical enclosures in a single management ring is not reached.
  2. The customer has to expand the management ring capacity either by adding HPE Composer 2 modules or adding memory to reach 128GB per module.
  3. The customer has to create a new management ring for new logical enclosure because the maximum number of frames m a single management ring is reached.
  4. The customer can add a new logical enclosure to an existing setup once all required licenses are added lo HPE OneView and associated with the new frames.

Answer(s): A



Your customer added a new Ethernet network in HPE Oneview mat is used to manage their HPE Synergy platform.
When the customer tries to connect one of the compute nodes to this network through the server profile, this network is not available.
What must be done to fix this issue?

  1. Check the Logical Enclosure settings and verify if the maximum number of networks allowed for this LE is reached.
  2. To make this network available to use in the server profile, the customer must enable the Smart Link feature within network definition.
  3. The newly created network must be added to the uplink set within the LIG, and Logical interconnect configuration must be updated from the LIG.
  4. Check within the server profile which server hardware is used and perform the Refresh operation on this compute node to get the latest adapter information.

Answer(s): C