Your customer plans to deploy a VMware ESXi with HPE Synergy platform. They also plan a vSAN deployment leveraging HPE D3940 Storage Modules and SSD drives The customer requested the following components:
- HPE Synergy frame with ten HPE Synergy 480 Gen10 Plus compute modules
- Two HPE Virtual Connect SE 100Gb F32 Modules for Synergy
- An appropriate number of vSAN Standard licenses for each compute node
- One HPE O3940 Storage Module with 40 SSDs - All required cables and options Which statement about this request is true?

  1. vSphere licenses should be added, as vSAN licenses do not replace vSphere licenses
  2. vSphere Standard licenses should be replaced with Enterprise Plus licenses to enable vSAN
  3. One HPE Virtual Connect SE 100Gb F32 Module for Synergy should be replaced with 50GD/S ILM
  4. 20 SSD drives should be removed from this setup, as D3940 supports only 20 SSD or SAS drives.

Answer(s): B



Your customer plans to deploy a VMware ESXi with HPE Synergy platform. They plan to use

Distributed Switches and DRS cluster
You are preparing a proposal with the following components:
- HPE Synergy frame with ten HPE Synergy 480 Gen10 Plus compute modules
- two HPE Virtual Connect SE 100Gb F32 Modules for Synergy
- an appropriate number of the vSphere Standard licenses for each compute node
- one HPE D3940 Storage Modules with 40 SSDs - all required cables and options Which statement about this proposal is true?

  1. One HPE Virtual Connect SE 100Gb F32 Module for Synergy should be replaced with 50GD/S ILM
  2. vSphere Standard licenses should be replaced with Enterprise Pius licenses to enable requested features
  3. 2 additional HPE Synergy 480 Gen10 Plus compute modules can be added to this setup
  4. 20 SSD drives should be removed from this setup, as D3940 supports only 20 SSD or SAS drive.

Answer(s): B



Your customer has the following HPE Synergy setup
- 3 HPE Synergy 12000 Frames
- 4 HPE Virtual Connect SE 100 Gb F32 Modules
- 2 HPE Synergy 50 GO Interconnect Link Modules
- 36 HPE Synergy 480 Gen10 Plus compute modules
- 2 HPE Composer 2 modules
Which statement about this setup is true?

  1. To use all compute nodes, the customer must create at least two logical enclosures
  2. To manage all frames, the customer must buy two additional HPE Composer 2 modules
  3. The customer must buy 36 HPE OneView Advanced licenses to manage compute modules
  4. The customer can add one D3940 storage Module to each of the frames

Answer(s): C



HOTSPOT (Drag and Drop is not supported). (Drag and Drop is not supported)
An HPE Synergy customer needs to prevent a timeout and loss of communication during an external switch firmware upgrade.
Click the parameter that the customer should configure within an uplink set to meet this requirement

  1. See Explanation section for answer.

Answer(s): A

Explanation:



Page 3 of 20



Post your Comments and Discuss HP HPE0-S60 exam with other Community members:

MXF commented on August 28, 2023
I need the HPE0-S60, Please
EUROPEAN UNION
upvote