(_______________) is a fire detector that detects smoke particles.
Answer(s): C
The PLF (Power Load Factor) is defined as the ratio of the data center power consumption of the power distribution system to the power consumption of the IT equipment.
Answer(s): A
Which of the following functions can be achieved by dynamic environment monitoring system? (Multiple choice)
Answer(s): A,B,C,D
How many power modules at most can be inserted in ECC800 collector of Huawei monitoring system?
Answer(s): B
Post your Comments and Discuss Huawei H12-411 exam with other Community members: