Free H12-425 Exam Braindumps (page: 1)

Page 1 of 61

4G antenna of ECC800 should be connected to ( ).

  1. RF_ZA line interface
  2. 3G/4G antenna interface
  3. RS485 port
  4. DO output dry contact

Answer(s): B



NetEco can mail reports to customers.

  1. TRUE
  2. FALSE

Answer(s): A



(___________________) is the signal processing and centralized management module of UPS5000-E

  1. Energy control module (ECM)
  2. Power Module
  3. Bypass Module
  4. Maintenance bypass module

Answer(s): A



When installing the power line on the UPS5000-E, if there are different sources on the main-lines and bypass, you need to remove the copper bars connected to the bypass and main lines first, and then connect the main circuit and bypass input respectively.

  1. TRUE
  2. FALSE

Answer(s): A