The thermal insulation foam of NetCol5000-C is damage, what happen?
Answer(s): C
In the process of disconnecting the battery pack switch, if there are multiple sets of batteries, first disconnect the main switch between the battery pack and the UPS, and then disconnect the switch of each battery pack
Answer(s): A
FusionModule1000A series solution meets the TIER 4 requirements if it adopts 2N power supply and distribution system.
Answer(s): B
(FM1000Adoes not support Tier 4)
In the water-side free cooling solution, cold water can be transported directly from the cooling tower to chilled water air conditioner.