When turning on the maintenance bypass switch of UPS5000-E after the maintenance completed, to make sure loads continue to be powered, which of the following should be noted?
Answer(s): A
The compressor discharge temperature of NetCol5000-A is high, the possible reasons ( ).
Answer(s): A,B,C
When four UPS2000-G-20K parallel setting is "3+1", the capacity of the system is ( ) KVA.
Answer(s): C
The cold/hot aisle containment systems can improve cooling efficiency and reduce power consumption.