Free H13-531_V2.0 Exam Braindumps
HCIE-Cloud Computing (Written) V2.0 Exam Questions 321–325 (page: 66)

Updated On: 9-Feb-2026

Which of the following FusionComputeCan the operation take effect immediately?

  1. InstallTools
  2. Disk reduction
  3. remove network card
  4. Direct read and write to the newly bound disk

Answer(s): C



Which of the following scenarios must be implemented through network virtualization? (multiple choice)

  1. Multiple virtual machines share one physical network port.
  2. Virtual machines are frequently migrated across physical servers.
  3. The physical machine communicates with the outside worlD.
  4. Realize the requirements of location-independent, elastic scaling, and on-demand use of network resources.

Answer(s): A,B,D



Which of the following descriptions about the rapid provisioning of virtual desktops by FusionAccess is incorrect?

  1. The system disk capacity set when creating a virtual machine cannot exceed the remaining capacity of the datastore.
  2. For linked clone type virtual machines, it is recommended to use high-performance storage for the system disk.
  3. When the desktop group type is static pool,WIThe name of the virtual machine seen on the desktop is the name defined by the virtual machine naming specification
  4. When the desktop group type is private,WIThe name of the desktop virtual machine seen above is the name defined by the virtual machine naming specification.

Answer(s): A



Which of the following processing policies does FusionCompute support when a Windows virtual machine blue screen occurs? (multiple choice)

  1. do not handle
  2. Restart the virtual machine
  3. HAvirtual machine
  4. Shut down the virtual machine

Answer(s): A,B,C,D



Which of the following descriptions about FusionCloud troubleshooting are correct? (multiple choice)

  1. If you want to perform some major operations during the troubleshooting process, you should back up the relevant databases, alarm information and log files, etc.
  2. Fault handling should comprehensively consider the possibility and time cost of the corresponding operation to restore business success.
  3. The principle is to restore the system as soon as possible.
  4. When determining the fault handling party, you should first evaluate the impact and give priority to ensuring the normal operation of the business.

Answer(s): A,B,D



Viewing page 66 of 154
Viewing questions 326 - 330 out of 765 questions


Post your Comments and Discuss Huawei H13-531_V2.0 exam prep with other Community members:

AI Tutor AI Tutor 👋 I’m here to help!