Free H13-621 Exam Braindumps
HCNP-Storage-CUSN(Constructing Unifying Storage Network) Questions 151–155 (page: 32)

Updated On: 10-Feb-2026

For snapshot , LUN copy and remote replication of storage array, which of the following statement is true? (Select 3 Answers)

  1. add resources LUN in resource pool, controller A and B both added and equal size, which is the best
  2. create LUN copy if confusing the source LUN and target LUN may result in data loss
  3. create remote copy if confusing the source LUN and target LUN may lead to the data unavailable
  4. if the space of the resource pools is insufficient, system will automatically use the residual capacity of safe space as a resource pool space

Answer(s): A,B,C



For incremental LUN copy of storage array, which of the following is correct?

  1. it is real-time synchronization
  2. in the process of copy, target LUN can mount to use
  3. can be used in A-A backup mode
  4. the incremental LUN copy and LUN copy use public License

Answer(s): D



When centrally manage asynchronous remote copy homework through HostAgent, proposed to set asynchronous remote replication time length to:

  1. manual
  2. at the beginning of the synchronization time waiting
  3. at the end of the synchronous time waiting
  4. automatic

Answer(s): A



Which component is responsible for connecting to the array to distribute in-band command in HostAgent?

  1. HyperManager server
  2. InbandAgent
  3. ConsistentAgent
  4. HyperManager client

Answer(s): B



Reliability is product and system under specified conditions, in schedule time can able to complete the required function.

  1. True
  2. False

Answer(s): A



Viewing page 32 of 60
Viewing questions 156 - 160 out of 294 questions


Post your Comments and Discuss Huawei H13-621 exam prep with other Community members:

AI Tutor AI Tutor 👋 I’m here to help!