Free CT-TAE Exam Braindumps (page: 10)

Page 10 of 20

You are executing the first test run of a test automation suite of 200 tests. All the relevant information related to the state of the SUT and to the automated test execution is stored in a small database. During the Automated test run you observe that the first 10 test pass, while an abnormal termination occurs when executing the 11th test. This test does not complete its execution and the overall execution of the suite is aborted. An immediate analysis of the abnormal termination is expected to be time consuming and you have been asked to produce a detailed report of the execution results for the first test run, as soon as possible.

What is the MOST important FIRST step to be taken immediately after the abnormal occurred when executing the 11th test?

  1. Re-run the test automation suite starting from the 12th test
  2. Return the database to a consistent state that allows subsequent test to run
  3. Take a backup of the database in its current state. So It can be analyzed later
  4. Re-run the test automation suite starting from the 1st test.

Answer(s): C



Consider a TAS that uses a keyword-driven framework. The SUT is a web application and there is a large set of keywords available for writing the automated tests that relate to highly specific user actions linked directly to the GUI of the SUT. The automated test written with the keywords are statically analyzed by a custom tool which highlight's repeated instances of identical sequence of keywords. The waiting mechanism implemented by the TAS for a webpage load is based on a synchronous sampling within a given timeout. The TAS allows checking a webpage load every seconds until a timeout value

  1. Changing the scripting approach to data-driven scripting
  2. Implementing keywords with a higher level of granularity
  3. Changing the wait mechanism to explicit hard-coded waits
  4. Establishing an error recovery process for TAS and SUT

Answer(s): C



Consider A TAS for testing a desktop application via its GUI. All the test cases of the automated test suite contain the same identical sequences of steps at the beginning (to create the necessary objects when doing a preliminary configuration of the test environment and at the end (to remove everything created ­specifically for the test itself during the preliminary configuration of the test environment). All automated test cases use the same set of assertion functions from a shared library, for verifying the values in the GUI fields ( e.g text boxes).

What is the BEST recommendation for improving the TAS?

  1. Implementing keywords with higher level of granularity
  2. Improving the architecture of the application in order to improve its testability
  3. Adopting a set of standard verification methods for use by all automated tests
  4. Implementing standard setup and teardown functions at test case level

Answer(s): A



Assume that you are the TAE responsible for the correct functioning of a TAS, deployed in a test environment that consists of a few machines running the same version of the operating system. The

TAS has been working and stable since its deployment, it has been used to run an automated test suite consisting of many similar automated test. The infrastructure team is planning to update the operating system on these machines by installing a new the service pack for security reasons. Since the vendor of the operating system assurance full backward compatibility, the infrastructure team assurance that there will be no impacts on the functioning of the TAS.

What is the BEST approach to confirm the correct functioning of the TAS in this scenario?

  1. Verify the behavior of the automated tests by running a small tests, then gradually run the remaining tests to confirm the correct functioning of the whole automated test suite.
  2. Make sure that the infrastructure team has completed installing the service pack on the machines where SUT is running, then run the whole automated test suite to verify its behavior
  3. Verify the behavior of the whole automated test suite by running all the automated tests
  4. Do not run any tests because you can immediately confirm the correct functioning of the automated test suite

Answer(s): A



Page 10 of 20



Post your Comments and Discuss ISTQB® CT-TAE exam with other Community members:

Ni commented on December 25, 2024
useful questions
Anonymous
upvote

ry commented on December 24, 2024
very helpful
Anonymous
upvote

Jatin Gohil commented on December 24, 2024
Good contents. The exams questions are real
Anonymous
upvote

Anonymous commented on December 24, 2024
very useful
CHILE
upvote

Mohamedk commented on December 24, 2024
It's very nice
Anonymous
upvote

Amer commented on December 24, 2024
Thanks alot
EGYPT
upvote

shankar commented on December 24, 2024
good set of questions
CHINA
upvote

VARSHA commented on December 24, 2024
GOOD QUSTIOENS.. LIKED IT
Anonymous
upvote

Robin commented on December 24, 2024
nice course
Anonymous
upvote

Rama laksmana commented on December 23, 2024
Good question
UNITED STATES
upvote

Chandru commented on December 23, 2024
Nice questions
UNITED STATES
upvote

Amr commented on December 23, 2024
Good tutorial
Anonymous
upvote

hari commented on December 23, 2024
Preparing for exam
INDIA
upvote

Ichigo Kurosaki commented on December 23, 2024
Can I pass the exam, if I have done suppose 150 questions from here?
MALAYSIA
upvote

Emma commented on December 23, 2024
Really helpful for preparing the exam
FRANCE
upvote

Siva commented on December 23, 2024
Good ones with the quick start
INDIA
upvote

sj commented on December 22, 2024
good set of questions
Anonymous
upvote

sj commented on December 22, 2024
Questions that are typically not covered as part of the aws learning course videos
Anonymous
upvote

sowmya commented on December 22, 2024
helpfull to prepare for the exam
Anonymous
upvote

Leandro commented on December 22, 2024
very usefull
BRAZIL
upvote

vishal solanke commented on December 22, 2024
Please try to post explanations
Anonymous
upvote

Suchi Poddar commented on December 22, 2024
Good set and nice to see that so much help for the students. Thankyou so much.
Anonymous
upvote

Prashant commented on December 22, 2024
good practise
Anonymous
upvote

shree sri commented on December 22, 2024
great work for learning
UNITED STATES
upvote

M Ajaykumar commented on December 21, 2024
Literally helpful
Anonymous
upvote

Narasimha commented on December 21, 2024
it is helpful for ACE GCP Exsm
INDIA
upvote

shan commented on December 21, 2024
Nice questions
Anonymous
upvote

resha commented on December 21, 2024
Very nicely explained
Anonymous
upvote

Abhishek commented on December 21, 2024
It was Nice
Anonymous
upvote

Sumeet G Hongekar commented on December 21, 2024
I am eger to write cad exaam
UNITED STATES
upvote

KAREEM ROFIAT BOLANLE commented on December 21, 2024
not yet written the exam
Anonymous
upvote

Subham commented on December 21, 2024
Good set of question for practice
Anonymous
upvote

Krish commented on December 20, 2024
Good to have test papers
INDIA
upvote

Ashish Sharma commented on December 20, 2024
Very elaborative explanation and apt questions
CANADA
upvote