ISTQB ISTQB-ADVANCED-LEV1 Exam Questions
ISTQB Advanced Level Test manager Exam (Page 2 )

Updated On: 27-Feb-2026

According to ISTQB syllabus, systems of systems;

I). Contain interconnected hardware, software applications and communications.
II). Include big bang merging of independent collaborating systems to avoid creating the entire system from scratch.
III). Can be less reliable than individual systems
IV). Characteristics include; long duration of projects, version management and regression tests at systems of systems level.

  1. I, II and IV are true.
  2. I, II are true and III is false.
  3. I, III, and IV are true, II is false.
  4. II,III and IV are true, I is false.

Answer(s): C



Select the correct statement;

  1. Testing processes are interconnected and related to activities like requirements engineering, software development, etc.
  2. Testing tasks cannot be concurrent.
  3. Requirements engineering and software testing are two isolated activities.
  4. Testing activities / processes do not have to be aligned to the chosen software development lifecycle model.

Answer(s): A



Which of the following statements are false?

I). Test execution starts when the system entry criteria are met (or waived) and test execution ends when exit criteria are met.
II). System test environment creation might start during system design in V-model
III). Long term prospects needs to be considered when selecting test process or tools.
IV). Daily/weekly scrum meetings are part of agile testing method.

  1. I and II and false.
  2. II, III and IV are false
  3. I, II, III are false
  4. None of them are false

Answer(s): D



System test closure activities occur;

I). After system exit criteria are met.
II). After acceptance testing is over.
III). After all project activities are finished.
IV). After the execution of all test cases.

  1. I,II and IV are true
  2. II and IV are true
  3. I,II, III are true
  4. All of them are true

Answer(s): C



Which of the following statements are true?

I). Early test planning and later test execution is an activity of sequential software development model
II). Change and configuration management are not needed for software testing activities.
III). Based on the project context, additional levels of testing like hardware-software integration testing, feature interaction testing can be done.
IV). System test planning and project planning could occur concurrently in V-model.

  1. I, II and III are true.
  2. II, III and IV are true.
  3. I, III and IV are true.
  4. I and III are true.

Answer(s): C






Post your Comments and Discuss ISTQB ISTQB-ADVANCED-LEV1 exam dumps with other Community members:

Join the ISTQB-ADVANCED-LEV1 Discussion