A customer needs a DR solution designed around the following requirements:•There are 8 ms of latency between Sites A and B•The administrator needs the shortest RPO/RTO possible•Application consistent snapshots are required•Use of Nutanix VSSWhich Data Protection Method should be used?
Answer(s): C
https://portal.nutanix.com/page/documents/details?targetId=Prism-Element-Data-Protection-Guide-v5_18:wc-dr-application-consistent-snapshots-wc-r.html
An administrator needs to replace the self-signed certificate on a cluster. Which two requirements must be met as part of the process? (Choose two.)
Answer(s): B,D
https://portal.nutanix.com/page/documents/details?targetId=Prism-Central-Guide-Prism-v55:mul-security-ssl-certificate-pc-t.html
An administrator needs to evaluate if the existing configuration of Protection Domains meets the specified corporate recovery policy for SQL Data. The corporate policy requires that all SQL Servers be recoverable at the DR site within 30 minutes, and must result in a maximum of 60 minutes of data loss. SQL data must be required.The protection domain is configured as follows:•Application consistent snapshots are enabled•The SQL server VMs are assigned to the Protection Domain as their own Consistency Group•The Protection Domain schedule is configured as snapshots taken every 90 minutes from 7 am until 8 pmWhat must be changed to meet the required policy?
Answer(s): B
An administrator is monitoring the Nutanix v5.15-based AOS cluster performance logs and notices that a SQL server VM is greatly exceeding its intended maximum IOPS. The administrator has confirmed that a QoS policy was previously created for the group of VMs this server is a member of. What are two reasons that this VM would exceed its maximum configured IOPS from the QoS Policy? (Choose two.)
Answer(s): B,C
https://portal.nutanix.com/page/documents/details?targetId=Prism-Central-Guide-Prism-v5_18:mul-storage-qos-pc-c.html
An administrator needs to make sure an RF3 cluster can survive a failure of two complete racks without negatively affecting performance. The current cluster configuration consists of the following:•30 All Flash Nodes: distributed 10 nodes per rack across three 42U racks•Each node is configured with 20TB usable storage all flash (Cluster Total 600TB Usable)•Current cluster utilization is 500TB storage•Storage containers have Erasure Coding enabledWhich configuration changes should be made to make sure the cluster meets the requirements?
https://portal.nutanix.com/page/documents/details?targetId=Web-Console-Guide-Prism-v5_17:arc-configure-fault-tolerance-rack-prism-c.html
Post your Comments and Discuss Nutanix NCM-MCI-5.20 exam prep with other Community members:
Our website is free, but we have to fight against AI bots and content theft. We're sorry for the inconvenience caused by these security measures. You can access the rest of the NCM-MCI-5.20 content, but please register or login to continue.