A customer recently set up Async Replication between Site A and Site B. The customer wants to conduct a planned failover and clicks Activate on Site B.The customer then runs the following command on Site A:ncli pd deactivate_and destroy_vms name=<protection_domain_name>What does this do to the customer environment?
Answer(s): C
https://portal.nutanix.com/page/documents/details?targetId=Web-Console-Guide-Prism-v5_10:wc- protection-domain-failback-disaster.html
An administrator needs to forecast infrastructure requirements for a new program and its associated applications. Prior to the projected start of the new program, all existing applications will be decommissioned.How should the administrator perform this task?
Answer(s): A
A customer has a primary datacenter with 12 Nutanix blocks distributed across three racks. The customer wants to achieve the most resiliency possible. They also have a datacenter in a branch office that is 400 kilometers away from the primary datacenter.Which two solutions should be used? (Choose two.)
Answer(s): B,C
An administrator inherits a new Nutanix environment and logs in to a CVM to check the network configuration. The configuration is as follows: Which action should the administrator take to improve network performance?
An administrator is concerned that Prism will be inaccessible if Active Directory is unable to process logins. Which method should the administrator use to access the cluster in the event of this type of outage?
Answer(s): B