Nutanix NCP-BC Exam Prep
Nutanix Certified Professional - Business Continuity v7.5 (Page 3 )

Updated On: 27-Aug-2026

An administrator needs to provide leadership with a report showing the timeframe of each step during Recovery Plan failover testing.
How should the administrator produce this report?

  1. Filter the Events log in Prism Central for Recovery Plan activity.
  2. Review the built-in execution report from the test failover results.
  3. Generate a custom report within Prism Central Intelligent Operations.
  4. Use ncli on a CVM to query Recovery Plan execution history.

Answer(s): B



How does Nutanix Disaster Recovery automatically handle Container Mapping if a storage container with the same name does not exist at the recovery Nutanix cluster?

  1. The data is temporarily kept in the SSD tier of the remote site pending intervention.
  2. The system automatically creates a new Storage Container with the same name on the remote site.
  3. The initial replication fails and generates a critical alert requiring manual mapping in Prism Central.
  4. The recovery points replicate to a random storage container at the recovery Nutanix cluster.

Answer(s): B



An administrator finds replications for Marketing VMs are failing to replicate. After doing some digging the administrator was able to find the following:
Connectivity was confirmed on ports 2020 and 2009 between the clusters
All other VMs are replicating successfully
Cluster wide storage has plenty of remaining space
No firewall exists between the sites
Marketing VMs are running Windows, successful VMs are running Linux
What could be causing the Marketing VMs to fail replications?

  1. Linux VMs are set up with a container mapping on the remote site.
  2. Marketing VMs are replicating using Async instead of NearSync.
  3. Marketing VMs are replicating to a container with zero free space.
  4. Linux VMs are replicating using Async instead of NearSync.

Answer(s): A



A company's two clusters are part of the same availability zone. Prism Central, which holds the protection policy configuration and recovery plans, is located on Cluster A and protected by the Prism Central Backup and Restore mechanism.
What is the first step to take to execute a disaster recovery plan on the datacenter hosting Cluster A?

  1. Restore the Prism Central instance from Prism Element on the surviving cluster.
  2. Deploy a new Prism Central instance on the surviving cluster and register the cluster to it to access the replicated VM snapshots.
  3. Log into Prism Element on the surviving cluster and execute the Recovery Plan.
  4. Access the Prism Central web interface via its Floating IP to trigger the "Unplanned Failover" workflow for the affected VMs.

Answer(s): A



After a failover and stabilization of workloads at the recovery AZ, an administrator removes several VMs from the protection policy because they are no longer required.
Which action should be performed as part of post-failover cleanup to prevent unnecessary storage consumption?

  1. Recreate the recovery plan.
  2. Reconfigure the replication schedule.
  3. Delete the associated recovery points.
  4. Disable Nearsync replication.

Answer(s): B



Viewing page 3 of 23
Viewing questions 11 - 15 out of 109 questions


Post your Comments and Discuss Nutanix NCP-BC exam prep with other Community members: