After finishing foundation on an AHV cluster, a consultant is preparing to plug into the customer network given the following set of requirements:* All network traffic on trunks is tagged* Customer is using LACP* A native VLAN is not in useWhich set of commands should the consultant use to ensure cluster connectivity on customer equipment?
Answer(s): A
An administrator migrates a VM onto a new Nutanix cluster. After the migration, the administrator observes the following conditions:· Cluster memory utilization: 64%· Cluster CPU utilization: 19%· Clusterstorage utilization: 32%· Average VM CPU utilization: 25%· Average VM CPU ready%: 24%· Average VM memory utilization: 60%Which two changes should the administrator make to improve VM performance? (Choose two.)
Answer(s): B,D
http://www.joshodgers.com/tag/cpu-ready/
An administrator needs to migrate workloads from a Nutanix cluster running VMware ESXi to Nutanix AHV. The migration process needs to be completed in multiple VM groups and support roll back in caseany problems are found during user acceptance testing.Which action should the administrator perform?
Answer(s): C
https://next.nutanix.com/installation-configuration-23/convert-existing- nutanix-vmware-cluster-to-nutanix-only-37600
A customer is running out of storage in an ESXi cluster. The customer wants to add storage without paying for an additional hypervisor license.Which option should the consultant recommend to meet the requirement?
Post your Comments and Discuss Nutanix NCS-CORE exam with other Community members:
hanaa commented on October 03, 2023 is this dump still valid??? Anonymous upvote
hanaa commented on October 03, 2023 Is this dump still valid??? Anonymous upvote
Our website is free, but we have to fight against bots and content theft. We're sorry for the inconvenience caused by these security measures. You can access the rest of the NCS-CORE content, but please register or login to continue.