While preparing for a new four-node cluster installation, the consultant has a Tech ReviewCall with the customer. The hardware is as follows:* 4 nodes in 1 Block* 8 x 10 GbE Ports* 4 x 1 GbE IPMI Ports* Adequate Ethernet ports are available* Ethernet cables are correct and available* Adequate rack space is availableWhich remaining item must be confirmed as available onsite?
Answer(s): C
An organization is running a Nutanix Cluster based on AOS 5.10.x and VMware vSphere 6.7. Currently, the CVM network is segmented and Storage only nodes not present.A new security project based on NSX is coming. VMware Distributed Virtual Switches are required. The administrator needs to prepare the environment for the new project.Which step should the administrator use to initiate the project?
Answer(s): D
After deploying an AHV cluster connected to Cisco Nexus 9k switches, unexpected network behavior is observed. The consultant needs to rule out physical network mis- cabling without returning to the datacenter.Which command from the host should the consultant run?
HOTSPOTAn administrator is configuring an All Flash cluster to support the following workloads:· Full clone virtual desktops· Hadoop· Write heavy databasesWhichthree correct configuration options should the administrator use to meet the item requirements? (Choose three.)For each procedure, indicate whether it is a correct or incorrect procedure that must be configured to meet the item requirements using the drop-down option.
Answer(s): A
Post your Comments and Discuss Nutanix NCS-CORE exam with other Community members:
hanaa commented on October 03, 2023 is this dump still valid??? Anonymous upvote
hanaa commented on October 03, 2023 Is this dump still valid??? Anonymous upvote
Our website is free, but we have to fight against bots and content theft. We're sorry for the inconvenience caused by these security measures. You can access the rest of the NCS-CORE content, but please register or login to continue.