A customer has a G6 AHV cluster with 4x10GbE NICs on each node and the following configuration:* Networking is set to default* Only two NICs are connectedThe customer receives the following critical message:The NIC is disconnected from the switch, or the switchport is failing.What should the consultant verify to resolve the issue?
Answer(s): A
An administrator is performing a set of routine checks and notes that Prism Central is running with 4 vCPUs and 21 GB RAM. The organizations environment is based on two Nutanix clusters with 170 VMs plus a Legacy vSphere infrastructure. No manual changes have been done on Prism Central VM.Which configuration justifies the current Prism Central configuration?
Answer(s): D
Which Nutanix feature creation is described in the Knowledge Transfer?
A customer wants to expand an existing cluster with three additional nodes. After running the Foundation process on the new nodes, the customer realizes that the wrong IPs where used and the nodes are configured on a different network. The customer decides to create a new cluster instead.Which method should be used to recreate the cluster?
Answer(s): B
A consultant is performing a Nutanix Cluster installation on Dell XC Core hardware. The consultant decides to use Foundation Portable for Mac to perform the installation. When the consultant arrives onsite, Foundation Portable is unable to locate the new nodes.Which log should the consultant check to troubleshoot this issue?