A consultant is running the Foundation VM using desktop virtualization software. No nodes are discovered.What should the consultant verify first?
Answer(s): C
An administrator is deploying a new application to a Nutanix Enterprise Cloud. The application requires a security to prevent unauthorized access. Theapplication also uses many non-standard ports that are unique to it. Security should not be changed for existing applications.What should the administrator do to meet these requirement?
A consultant is deploying a two-node cluster at a remote branch office.Which component must be available to complete cluster configuration?
Answer(s): B
While preparing for a new four-node cluster installation, the consultant has a Tech ReviewCall with the customer. The hardware is as follows:* 4 nodes in 1 Block* 8 x 10 GbE Ports* 4 x 1 GbE IPMI Ports* Adequate Ethernet ports are available* Ethernet cables are correct and available* Adequate rack space is availableWhich remaining item must be confirmed as available onsite?
An organization is running a Nutanix Cluster based on AOS 5.10.x and VMware vSphere 6.7. Currently, the CVM network is segmented and Storage only nodes not present.A new security project based on NSX is coming. VMware Distributed Virtual Switches are required. The administrator needs to prepare the environment for the new project.Which step should the administrator use to initiate the project?
Answer(s): D
Post your Comments and Discuss Nutanix NCS-CORE exam dumps with other Community members:
💬 Did you find this helpful?
Thank you for sharing! Your feedback helps the community.