An SE determines a POC is necessary for a prospect that has struggled with application downtime due to hypervisor and firmware upgrades that have exceeded planned maintenance windows. The prospect has also struggled with infrastructure resource planning for their growing development environment.Which two success criteria should the SE include? (Choose two)
Answer(s): A,B
An SE is performing workload discovery with an SMB prospect running SQL Server. The databases is less than 1 TB, but its performance and uptime are critical to the prospect's business operations. Sizer sugests using 1065S nodes.Which aspects of the NX-1065S-G5 would cause an SE to filter out that nodel from Sizer's Automatic configuration? (choose two.)
Answer(s): C,E
Refer to the exhibit.In Sizer, in which two ways can an SE accommodate a specific number of physical host- based software licenses that a customer has available for a project? (Choose two)
Answer(s): B,D
Which function does the Curator service perform?
Answer(s): D
An administrator needs to configure Acropolis File Service (AFS). The administrator is setting up AFS for the first time on the Nutanix cluster.How many file services VMs are created by default?
Answer(s): B
Post your Comments and Discuss Nutanix NCSE-Core exam prep with other Community members:
Our website is free, but we have to fight against AI bots and content theft. We're sorry for the inconvenience caused by these security measures. You can access the rest of the NCSE-Core content, but please register or login to continue.