Free NCSE-Core Exam Braindumps (page: 23)

Page 22 of 49

A customer needs to deploy 5000 virtual desktops on Nutanix. The requirements call for an active /active deployment, such that an entire site can be made unavailable due to maintenance or disaster without impacting desktop availability. What is the minimum number of nodes necessary to meet the customer's requirements?

  1. 13
  2. 26
  3. 52
  4. 104

Answer(s): C



During an initial discussion. a prospective customer indicates they are strongly considering

vSAN for their HCI initiative. The prospect's workloads are mostly read-intensive and they have over 1PB of archival data. The prospect expects to save on costs using storage efficiencies that their existing platform does not support. Which two Nutanix differentiators should the systems engineer discuss? (Choose two.)

  1. Compression on Hybrid Nodes
  2. Volume Group Load Balancing
  3. Data Locality
  4. CVM Autopathing

Answer(s): A,B



An SE is meeting with a prospect that is refreshing infrastructure in 100 retail locations. Currently the stores use vSphere hosts connected to direct attached storage and are managed by 6 separate vCenter servers. On-site retail staff is unqualified to deal with any hardware break/fix issues.

Which two aspects of Nutanix solution should the SE highlight? (Choose two)

  1. Self-healing infrastructure.
  2. Data Locality.
  3. Prism Central.
  4. Cloud Connect.

Answer(s): A,C



An SE builds a Sizer scenario for SQL server running on Cisco C240 M4 servers.

Using only the Sizer BOM, which two actions can be performed? (Choose two)

  1. Reference the HCL for additional SKU's relevant to the configuration.
  2. Review budgetary pricing.
  3. Review workload sizing details.
  4. Build a complete BOM in Cisco commerce Workspace (CCW)

Answer(s): A,C






Post your Comments and Discuss Nutanix NCSE-Core exam with other Community members:

NCSE-Core Discussions & Posts