An application contains cases which transition though different statuses throughout their life cycle which typ.ca, months.Design a reporting strategy to display the number of cases by status at the end of each month for a 12 month period.
Answer(s): A
While configuring GetNextWork, overriding the System Settings ruleGetNextWork__WorkBasketUrgencyThreshold imposes a minimum cutoff value for assignment urgency.Which statement accurately depicts the system behavior when the GetNextWork_WorkBaseketUrgencyThreshold setting is overridden?
Answer(s): D
XYZ Corp requires employees to designate alternate operators to perform their work while they are on vacation. Work vacationing operators should be visible to alternate operators.How do you configure the application to handle this requirement?
Answer(s): B
DRAG DROPXYZ Inc.'s COE wants case life cycle developers to use a field group named "Claim" regardless of the application being developed.Select and move the three tasks that the COE performs for this requirement to the Task List column and place them in the correct order. (Choose Three)Exhibit A:Exhibit B:
A shipping case needs to wait n specific time period before progressing in its flow. The developer is considering using ;i wait shape or an assignment with an SI A to perform this (unction.Identify the two requirements for which a wait shape is the simpler approach. (Choose Two)
Answer(s): B,D
Post your Comments and Discuss Pegasystems PEGAPCLSA85V1 exam prep with other Community members: