The method of Steepest Ascent guides you toward a target inside the original inference space.

  1. True
  2. False

Answer(s): B



The Lean toolbox includes all of the following items except___________________.

  1. Poke-Yoke
  2. Standard Operating Procedures
  3. Kaizen
  4. 5S the work area

Answer(s): B



Questions that can be best answered by a Visual Factory include all of these except
__________________.

  1. Are setups optimized for lower scrap levels?
  2. Can extra inventory be seen easily?
  3. Can changeover challenges be recognized?
  4. Are unneeded tools or supplies easily noted?

Answer(s): A



Situations where standardized work needs to be incorporated include all of these except
_____________.

  1. Changeover instructions incomplete
  2. Lack of a system to assure proper inventory levels at repair stations
  3. Machines continually operating to reduce the labor cost per piece
  4. Process flow for the same product assembly taking various cycle time for completion

Answer(s): C



If a Six Sigma project was to reduce changeover times and the team found the project success was decreasing over time since changeover times began to creep back up, which Lean tools should be considered in the Control Phase to reestablish and sustain the project success?

  1. Improve the lighting to assure adequate visibility
  2. Confirm a Visual Factory exists to assure proper communication of status of machines
  3. Implement Kanbans to assure enough inventory for the process step
  4. Reword the standardized work instructions to use active verbs and not passive phrases

Answer(s): B