Free IASSC Lean Six Sigma - Black Belt Exam Braindumps
IASSC Lean Six Sigma - Black Belt Questions 126–130 (page: 27)

Updated On: 9-Feb-2026

The most appropriate type of FMEA for a product before going into manufacturing is a___________________ FMEA.

  1. Design
  2. Consumer
  3. Survey
  4. Test Process

Answer(s): A



Which one of the listed tools is frequently used to help drill down to possible causes once a Fishbone Diagram is constructed?

  1. 3 When Analysis
  2. Skeleton Diagnostic
  3. Ishikawa Diagram
  4. 5 Why Analysis

Answer(s): D



One of the primary deliverables from performing a SIPOC is to begin to understand which inputs have the greatest affect on the___________________ outputs.

  1. Management’s desired
  2. Supplier delivered
  3. Process operator
  4. Customer most valued

Answer(s): D



Two of the key deliverables for the Measure Phase are a robust description of the process and its flow and an assessment of the Management System.

  1. True
  2. False

Answer(s): B



A valuable tool to use during the Measure Phase to show material and information flow throughout an entire process is the_______________.

  1. Value Stream Map
  2. FMEA
  3. Pareto Chart
  4. Standard Operating Procedure

Answer(s): A



Viewing page 27 of 53
Viewing questions 131 - 135 out of 257 questions


Post your Comments and Discuss PEOPLECERT IASSC Lean Six Sigma - Black Belt exam prep with other Community members:

AI Tutor AI Tutor 👋 I’m here to help!