Universal Containers (UC) is considering updating their Salesforce Production Deployment as a part of their Release Mgmt process.
Which three best practices should UC consider for Production Deployment? Choose 3 ans.

  1. Announce the maintenance window ahead of time.
  2. Define a rollback strategy.
  3. Lert all users on the day of deployment.
  4. Schedule releases with Salesforce upgrades.
  5. Temporarily suspend configuration changes in production.

Answer(s): A,B,E



A Salesforce contractor has built an application for Universal Containers (UC) .The contractor will need to deploy multiple times from the contractor's own Salesforce to UC's Salesforce environments. Ultimately, UC has full control of the application's code, including its intellectual property

  1. Eclipse IDE
  2. Unmanaged Package
  3. Change Sets.
  4. Managed Package

Answer(s): B



Universal Containers (UC) is considering updating their Salesforce Release Management process.
Which three best practices should UC consider for Version Control? Choose 3 answers

  1. Maintain separate developer branches for minor and major releases.
  2. Automation is a must with various application branches in the repository.
  3. Maintain unrestricted access to the release sandboxes for all changes being deployed.
  4. Maintain a single repository for application with individual branches for projects.
  5. Maintain a single entry point for production from the master branch.

Answer(s): A,D,E



Universal Containers (UC) has received feedback from the field on several new feature requests that in business goals, UC is looking for a way to quickly get feedback and prioritize these requests.
Which two options should an Architect recommend? Choose 2 answers

  1. Present the feature requests at a Center of Excellence meeting.
  2. Create design standards around the new features being requested.
  3. Bring the feature request to the Test Manager to gain quality checks.
  4. Create the backlog or priority list in a project management tool.
  5. Send the requests to IT for a formal review at the end of the year.

Answer(s): A,C