Free C_HANATEC_19 Exam Braindumps
SAP Certified Technology Associate - SAP HANA 2.0 SPS07 Questions 16–20 (page: 5)

Updated On: 9-Feb-2026

What is the correct sequence of the following four steps when you restart the SAP HANA database system?

  1. 1. Row tables are loaded into memory.
    2. Column tables loaded
    3. Open transaction are recovered.
    4. Aborted transactions are rolled back
  2. 1. Row tables are loaded into memory.
    2. Open transactions are recovered
    3. Aborted transactions are rolled back
    4. Column tables are loaded
  3. 1. Aborted transactions are rolled back
    2. Open transactions are recovered
    3. Row tables are loaded into memory.
    4. Column tables are loaded
  4. 1. Aborted transactions are rolled back
    2. Row tables are loaded into memory.
    3. Open transactions are recovered.
    4. Column tables are loaded

Answer(s): B



Which feature do you configure to prevent the whole SAP HANA database system from reaching physical processing limits?

  1. Workload classes
  2. Capture and replay
  3. Performance trace
  4. Admission control

Answer(s): D



Which system privilege do you need to redistribute tables across the hosts in a scale-out system?

  1. optimizer admin
  2. data admin
  3. resource admin
  4. workload admin

Answer(s): C



Which characteristics describe an SAP HANA multitenant database container (MDC) system?
Note: There are 3 correct answers to this question.

  1. A multitenant database container system is identified by a single system ID (SID).
  2. Database isolation increases the isolation between tenant databases on operating system level
  3. Each tenant database runs its own compile server and the preprocessor server.
  4. The name server owns information about the location of tables and table partitions in databases.
  5. The name server provides index server functionality for the system database.

Answer(s): A,B,E



Your customer has purchased a 3 TB SAP HANA license.
TO which value do you set the GLOBAL ALLOCATION LIMIT parameter when you have four 2 TB nodes in an SAP HANA scale-out system consisting of three worker and one standby nodes?

  1. 1.5 TB
  2. 0.5 TB
  3. 2.0 TB
  4. 1.0 TB

Answer(s): D



Viewing page 5 of 18
Viewing questions 21 - 25 out of 85 questions


Post your Comments and Discuss SAP C_HANATEC_19 exam prep with other Community members:

AI Tutor AI Tutor 👋 I’m here to help!