Free C_IBP_2208 Exam Braindumps
SAP Certified Application Associate - SAP IBP for Supply Chain Questions 26–30 (page: 7)

Updated On: 9-Feb-2026

What actions can be performed in the Advanced Dashboards application?
Note: There are 3 correctanswers to this question.

  1. Link two analytics charts.
  2. Rename the charts.
  3. Add process templates.
  4. Display all assigned analytics on a single UI.
  5. Use drill-down functionality.

Answer(s): C,D,E



Which of the following solutions are feasible when usingthe time series supply optimizer?
Note: There are 3 correct answers to this question.

  1. Violation of minimum resource utilization
  2. Not adhering to maximum transport values
  3. Not respecting production capacity
  4. Violation of minimum aggregated inventory values
  5. Not-fully satisfied demands

Answer(s): A,D,E



You set up time-series integration using Cloud Integration for Data Services. During the integration process of master data, an error occurred. In the Data Integration app the job failed with status "Fatal Error". Howcan you find more details about the error?

  1. Navigate to the Master Data Workbook in Excel and open the Log.
  2. Download the Rejection Report in the Data Integration app.
  3. Navigate to the Manage Master Data app and open the Log.
  4. Download the Initial Problem Report in the Data Integration app.

Answer(s): C



Which are the mandatory preconditions for an attribute that can be used for saving the segmentation results?
Note: There are 2 correct answers to this question.

  1. The Business Meaning of the attribute hasbeen specified.
  2. The attribute should be a non-key attribute of the master data type.
  3. The attribute belongs to a simple or compound master data type.
  4. The attribute should be assigned to all planning levels.

Answer(s): B,C



What is a prerequisite for modeling outsourced manufacturers with production capacity using the Supply Optimizer?

  1. Use production lead times and offsets to manage components at the outsourced manufacturing location
  2. Ensure that the outsourced manufacturing locations have a separate subnetwork
  3. Model target inventory and stocks at the outsourced manufacturing location
  4. Model relative production costs across internal locations and outsourced manufacturing locations

Answer(s): D



Viewing page 7 of 17
Viewing questions 31 - 35 out of 80 questions


Post your Comments and Discuss SAP C_IBP_2208 exam prep with other Community members:

AI Tutor AI Tutor 👋 I’m here to help!