What capabilities of SAP S/4 HANA Cloud for Manufacturing enable inventory managers to manage costs? correct) *

  1. Inventory valuation performed in accordance with local legislation
  2. Split valuation defined by global categories
  3. Stock valuation determined with real-time updates for finished and semi-finished products
  4. Use of various attributes and account assignment objects from Controlling

Answer(s): A,C



What is achieved with the integration between SAP Concur and Predictive Accounting?

  1. Real-time budget check when transferring travel requests
  2. Travel planning for the fiscal year based on historic data
  3. Automatic expense payment with upcoming payroll run
  4. Travel request budget check reporting for approver reviews

Answer(s): A



Which new capabilities does the Kanban board provide with SAP S/4HANA Cloud 2008? (2 correct)

  1. Configure unit of measure for Kanban quantity
  2. Configure Kanban container label
  3. Display all production supply areas to one control cycle
  4. Display container status in text format

Answer(s): B,D



How are capacities considered in planning in the Perform Production Capacity Planning and Evaluation (31L) scope item?

  1. Material Requirements Planning (MPR) delivers capacity requirements. Overloads are identified and ^ worked on subsequently. Conversion to production orders is part of the process.
  2. Material Requirements Planning (MPR) delivers capacity requirements. Overloads are identified by ^ capacity evaluation. In case of bottleneck overloads the MRP is started again.
  3. Material Requirements Planning (MPR) delivers capacity requirements that are leveled simultaneously with available capacity. Remaining overloads are indicated by overload alerts.
  4. Material Requirements Planning (MPR) does NOT deliver capacity requirements. These are created in a separate step in capacity planning. Leveling is done only afeter conversion.

Answer(s): B



What are the first steps in the Material Requirements Planning processes in SAP S/4 HANA Cloud? (2

correct)

  1. Manage planned independent requirements
  2. Back order processing
  3. Convert planned orders
  4. Demand forecasting

Answer(s): A,C