During a project phase, your customer raises some questions concerning parameters of the procurement type in the material master in the SAP ECC system.
Which of the following procurement type properties are valid? (Choose two)

  1. If both procurement types are allowed with entry X (both procurement types), requirements planning assumes in- house production.
  2. Procurement types E (in-house production) and F (external procurement) always have to be further refined with special procurement types.
  3. Procurement types E (in-house production), F (external procurement), or X (both procurement types) can be selected for a material independent of the material type.
  4. If procurement type E (in-house production) is set, external procurement may still be possible, depending on the material type.

Answer(s): A,D



Which of the following master data can be used with process orders? (Choose three)

  1. Serial numbers
  2. Master recipes
  3. Resources
  4. Production/resource tools
  5. Production versions

Answer(s): B,C,E



You have maintained planning strategy group 10 (make-to-stock production) in the material master (SAP ECC) of a material. For the coming months, you have planned requirements with requirement type LSF (derived from main strategy
10). Now, you want to change the requirement type from LSF to VSF (in accordance with planning strategy 40, planning with final assembly) for requirements in the existing production plan. Which of the following scenarios are applicable in this case? (Choose two)

  1. You can enter the strategy group 40 in the material master, but the requirement type is not changed automatically for existing requirements.
  2. You must change the requirement type for planning strategy 10 to VSF in Customizing. The requirement type for all existing requirements is then changed by the next planning run.
  3. You can change the strategy group from 10 to 40 for the existing production plan in the material master, and the requirement type for all requirements is changed automatically.
  4. You can enter the strategy group 40 in the material master and change the present requirement for the product manually in the production plan.

Answer(s): A,D



The final assembly of a finished product should only be triggered when a customer order arrives.
Which planning strategy for the finished product do you use?

  1. Planning with make-to-stock (strategy 10)
  2. Planning at the assembly level (strategy 70)
  3. Planning without final assembly (strategy 50)
  4. Planning with final assembly (strategy 40)

Answer(s): C



You create a routing that includes five operations in an initial sequence (10, 20, 30, 40, 50). When capacity bottlenecks occur, you want to use a second sequence on other work centers for operations 30 and 40. Which sequence category do you use to create the second sequence in the system?

  1. Finish-start relationship
  2. Standard sequence
  3. Parallel sequence
  4. Alternative sequence

Answer(s): D